In this paper we consider multiprocessor scheduling with hard deadlines and investigate the cost of eliminating migration in the online setting. Let I be any set of jobs that can be completed by some migratory offline schedule on m processors. We show that I can also be completed by a nonmigratory online schedule using m speed-5.828 processors (i.e., processors 5.828 times faster). This result supplements the previous results that I can also be completed by a non-migratory offline schedule using 6m unit-speed processors [B. Kalyanasundaram and K. R. Pruhs, J. Algorithms, 38 (2001), pp. 2-24] or a migratory online schedule using m speed-2 processors [C. A. Phillips et al., Algorithmica. 32 (2002), pp. 163-200]. Our result is based on a simpl...