[EN] The connection conditions defined in the urban planning of Riba-Roja de Túria for sectors 1 "Gallipont" and 2 "La Gavina" establish the need to improve the current main road, through the execution of two roundabouts to provide access to those sectors. This main road mentioned is the CV-372, from La Pobla de Vallbona to Riba-Roja de Túria, which belongs to the Local Network of the Diputación de Valencia and constitutes the connection route between the municipalities of La Pobla de Vallbona and Riba-Roja de Túria. Currently, this stretch of road has several problems (cross section with insufficient width, damaged drainage system, excessive direct accesses, etc.). The present work analyzes what is the optimal solution to solve the descr...
[ES] Este Trabajo Final de Grado , es la definición del proyecto de construcción de una Ronda que pr...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-41...
[EN] The connection conditions defined in the urban planning of Riba-Roja de Túria for sectors 1 "Ga...
[EN] The connection conditions defined in the urban planning of Riba-Roja de Túria for sectors 1 "Ga...
[EN] The CV-375 road is located in the south of the town bypassing the urban nucleus, thus avoiding ...
[EN] This Final Degree Project comprises the part relating to the annex "Design of the nodes", of a ...
[EN] This Final Degree Project comprises the part relating to the annex "Design of the nodes", of a ...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] The purpose of the project is the study of solutions for improving road safety of the stretch o...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[ES] Este Trabajo Final de Grado , es la definición del proyecto de construcción de una Ronda que pr...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-41...
[EN] The connection conditions defined in the urban planning of Riba-Roja de Túria for sectors 1 "Ga...
[EN] The connection conditions defined in the urban planning of Riba-Roja de Túria for sectors 1 "Ga...
[EN] The CV-375 road is located in the south of the town bypassing the urban nucleus, thus avoiding ...
[EN] This Final Degree Project comprises the part relating to the annex "Design of the nodes", of a ...
[EN] This Final Degree Project comprises the part relating to the annex "Design of the nodes", of a ...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] The purpose of the project is the study of solutions for improving road safety of the stretch o...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[ES] Este Trabajo Final de Grado , es la definición del proyecto de construcción de una Ronda que pr...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-41...