[EN] The Draft aims to solve the existing problems at the intersection of road CV 405 with the CV-415 road in the town of Montserrat (Valencia), via a diamond interchange with an overpass. This work fulfills the objectives set for a final degree, applying the knowledge acquired. Previous road CV-405 study approach is taken as a starting point. Firstly, after an introduction of the situation, the factors affecting the design and concept of bonding and structure arise. Then, a number of alternatives are outlined, for both the link to the overpass, through a multi-criteria method choosing the optimal solution. Following, it is studied in a greater depth geotechnical and geological characteristics of the area, as well as hydrology, posing a sol...
[EN] The objective of this document has been to study the different possible solutions for the desig...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] The main purpose of this project is to define all the necessary works for the Alternative CV-57...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This final project is part of a multidisciplinary project in which the basic studies for the pr...
[EN] The main objective of this project is the study of solutions, design and the alternative propos...
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposal...
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposal...
[EN] This final degree Project deals with a geological and geotechnical study in Figueroles villeage...
[EN] This final degree Project deals with a geological and geotechnical study in Figueroles villeage...
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposal...
[EN] The objective of this study is the analysis of the seats that have taken place in the Mediterra...
[EN] The objective of this study is the analysis of the seats that have taken place in the Mediterra...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The objective of this document has been to study the different possible solutions for the desig...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] The main purpose of this project is to define all the necessary works for the Alternative CV-57...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This paper is a construction project of an alternative route of the roads CV - 35 and CV - 345 ...
[EN] This final project is part of a multidisciplinary project in which the basic studies for the pr...
[EN] The main objective of this project is the study of solutions, design and the alternative propos...
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposal...
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposal...
[EN] This final degree Project deals with a geological and geotechnical study in Figueroles villeage...
[EN] This final degree Project deals with a geological and geotechnical study in Figueroles villeage...
[EN] The aim of this Final Degree Project is the study of solutions, design and alternative proposal...
[EN] The objective of this study is the analysis of the seats that have taken place in the Mediterra...
[EN] The objective of this study is the analysis of the seats that have taken place in the Mediterra...
[EN] This final project has been jointly conducted by the students of the Dregree of Civil Engineeri...
[EN] The objective of this document has been to study the different possible solutions for the desig...
[EN] The link that connects the V-23 highway with the start of the A-23 or Mudéjar highway and the N...
[EN] The main purpose of this project is to define all the necessary works for the Alternative CV-57...