While wastage of materials has become a serious problem requiring urgent attention in the Nigerian Construction Industry, cost overrun is a problem, which affects 90 percent of the completed projects in the world; the argument on how to reduce/eliminate cost overrun has been on-going for the past 70 years; as the on-site wastage of materials leads to increases in the final project cost. Studies from different parts of the world have shown that construction-material waste represents a relatively large percentage of the production costs. Consequently, as a result of low levels of awareness, the Nigerian construction industry pays little attention to the effects of generated material waste on cost overruns. Thus, this research aimed to investi...
The problem of construction material waste remains unresolved, as a significant percentage of the ma...
Construction is one of the industries that contributes the largest waste on the environment, resulti...
The total amount of cost overruns for any construction project can be fully determined once the proj...
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian C...
Material waste and cost overrun have been identified as common problems in the construction industry...
Material wastage on construction sites can contribute to cost overruns. Research to provide evidence...
The Nigerian Construction Industry faces a problem of poor materials management that leads to, among...
It is believed that building material wastage on construction sites account for cost overruns and an...
Material waste production on construction sites is related to quantity of building materials leftove...
Improper control of materials during different stages of construction has caused waste and associate...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
This research paper evaluates the causes of construction waste generation on building sites in River...
Effective materials management on construction sites is handled carelessly by construction practitio...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...
The problem of construction material waste remains unresolved, as a significant percentage of the ma...
Construction is one of the industries that contributes the largest waste on the environment, resulti...
The total amount of cost overruns for any construction project can be fully determined once the proj...
While wastage of materials has become a serious problem requiring urgent attention in the Nigerian C...
Material waste and cost overrun have been identified as common problems in the construction industry...
Material wastage on construction sites can contribute to cost overruns. Research to provide evidence...
The Nigerian Construction Industry faces a problem of poor materials management that leads to, among...
It is believed that building material wastage on construction sites account for cost overruns and an...
Material waste production on construction sites is related to quantity of building materials leftove...
Improper control of materials during different stages of construction has caused waste and associate...
Ineffective planning and control of materials on sites can degenerate to poor performance and undesi...
This research paper evaluates the causes of construction waste generation on building sites in River...
Effective materials management on construction sites is handled carelessly by construction practitio...
The causes of construction waste (CW) in Nigeria have been a major topic for researchers over the la...
Nigeria generated over 40 million tonnes of waste between the years 2005 to 2010, while construction...
The problem of construction material waste remains unresolved, as a significant percentage of the ma...
Construction is one of the industries that contributes the largest waste on the environment, resulti...
The total amount of cost overruns for any construction project can be fully determined once the proj...