45 pp. Tables, references, maps. Township 18 South, Range 11 East, Sections 10, 11, 14, 15 & 22. Captured May 17, 2007.Proposes to reroute a portion of an existing 69-kV power line by constructing a power line corridor for approximately 3.5 miles. Includes removing trees from approximately 12.6 acres, clearing trees, drilling 10-foot deep holes to install wooden utility polls 70 feet high, and installing conductor wire. About 3.5 miles of existing power line would be removed from federal and private land
Docket No. 33388. This EA consists of five chapters. The EA describes the potential environmental im...
Proposed rebuild of the transmission line from Oakridge to Lowell in Lane County, Oregon.Department ...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate ...
The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Fla...
The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties...
Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 ...
<p>Powerline corridor managed by selective removal of trees to maintain low vegetation in Montville,...
The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV...
The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consid...
17 pp. Map. The private land is located within the Steens Mountain Cooperative Management and Prot...
Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transm...
The Western Area Power Administration (Western), an agency of the United States Department of Energy...
Tennessee Valley Authority (TVA) proposes to construct a new 500-kilovolt (kV) substation and the as...
The existing switchyards at Western Area Power Administration\u27s (WESTERN) Seminoe and Kortes faci...
Docket No. 33388. This EA consists of five chapters. The EA describes the potential environmental im...
Proposed rebuild of the transmission line from Oakridge to Lowell in Lane County, Oregon.Department ...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...
The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate ...
The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Fla...
The proposed overhead power line construction project (Sand Dunes to Ochoa, in Eddy and Lea Counties...
Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 ...
<p>Powerline corridor managed by selective removal of trees to maintain low vegetation in Montville,...
The report analyzes the proposed power project which includes a 69kV transmission line and a 12/69kV...
The ''National Environmental Policy Act of 1969'' (NEPA) requires Federal agency officials to consid...
17 pp. Map. The private land is located within the Steens Mountain Cooperative Management and Prot...
Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transm...
The Western Area Power Administration (Western), an agency of the United States Department of Energy...
Tennessee Valley Authority (TVA) proposes to construct a new 500-kilovolt (kV) substation and the as...
The existing switchyards at Western Area Power Administration\u27s (WESTERN) Seminoe and Kortes faci...
Docket No. 33388. This EA consists of five chapters. The EA describes the potential environmental im...
Proposed rebuild of the transmission line from Oakridge to Lowell in Lane County, Oregon.Department ...
The US Department of Energy, Western Area Power Administration (Western) proposes to replace an exis...