Most of construction projects suffer from delays. These delays could be due to several reasons such as, poor design, poor planning and variation orders. The most controversial type of delays in the construction industry is the concurrent delay. Ambiguity usually surrounds the concurrent delays when they exist in the project because they do not have a unified or agreed upon definition. In addition, there are different remedy theories in terms of time and cost when they arise. Therefore, the aim of this research is to highlight how the Egyptian Law perceive concurrency; in addition to performing a comprehensive literature review for the accepted definitions for concurrent delays. The scope of this literature includes how different countries l...
This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Thesis (MTech (Construction Management))--Cape Peninsula University of Technology, 2017.Delays are f...
Construction delay claims are inevitable in most projects in the construction industry. It is rarely...
One type of delay that often give rise to dispute is concurrent delay, where contractor delay occurs...
Delays in construction projects schedule is one of the most noticed problems. Delays may be caused b...
Concurrent delays on construction projects have been described as being the most conceptionally chal...
Methods for Analysing Concurrent Delays in Sri Lankan Construction Industry Difficulties arise when...
Construction projects are complex, from their design to the execution phase. Delivering a project on...
It was observed that the consideration of concurrency in delay claims in Sri Lankan construction ind...
In the UK over the last 50 years, legal developments in relation to extensions of time and/or moneta...
This dissertation investigated the significant types of delays that continually occurs in both the K...
AbstractConstruction delays are a common phenomenon in civil engineering projects in Egypt including...
Concurrent delays are one of the most contentious and dispute causing events on construction project...
Disputes in the construction industry originate primarily from the occurrence of delays, which are t...
This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Thesis (MTech (Construction Management))--Cape Peninsula University of Technology, 2017.Delays are f...
Construction delay claims are inevitable in most projects in the construction industry. It is rarely...
One type of delay that often give rise to dispute is concurrent delay, where contractor delay occurs...
Delays in construction projects schedule is one of the most noticed problems. Delays may be caused b...
Concurrent delays on construction projects have been described as being the most conceptionally chal...
Methods for Analysing Concurrent Delays in Sri Lankan Construction Industry Difficulties arise when...
Construction projects are complex, from their design to the execution phase. Delivering a project on...
It was observed that the consideration of concurrency in delay claims in Sri Lankan construction ind...
In the UK over the last 50 years, legal developments in relation to extensions of time and/or moneta...
This dissertation investigated the significant types of delays that continually occurs in both the K...
AbstractConstruction delays are a common phenomenon in civil engineering projects in Egypt including...
Concurrent delays are one of the most contentious and dispute causing events on construction project...
Disputes in the construction industry originate primarily from the occurrence of delays, which are t...
This thesis was submitted for the award of Doctor of Philosophy and was awarded by Brunel University...
Due to the character of the original source materials and the nature of batch digitization, quality ...
Thesis (MTech (Construction Management))--Cape Peninsula University of Technology, 2017.Delays are f...