Submitted to Office of Water Resources Research, U.S. Dept. of Interior.CER72-73EFS-VY13.Bibliography: pages 11-12.OWRR project no. B-064-COLO (CSU Project 31-1372-1632), period July 1, 1971 to June 30, 1972 and extended to December 31, 1972
Although this technical report does not specifically mention Waller Creek, the model construction an...
The prediction of rainstorms and floods in small and medium-sized watersheds, as well as the synthes...
CER68-69VY-GLS-MEH17.OWRR project no. B-005-COLO, period of research: July 1, 1966 - June 30, 1968.S...
CER72-73EFS-VY13.December 1, 1972.Includes bibliographical references (pages 11-12).OWRR project no....
Two independent hydrologic research projects, the development of (1) a research watershed system and...
This study was conducted in Pogung-Code sub watershed and Pulo-Opak sub watershed from 1993 to 2002....
This is a numerical prediction experiment of a watershed modeling system. A physically-based watersh...
This report embodies two principal objectives: 1) updating rainfall intensity-duration curves for th...
Soundly planned water resources development requires a knowledge of streamflow magnitudes and time p...
Watershed instrumentation system design consists of identifying the locations and types of stream ga...
Seasonal variations in precipitation on a watershed lead to variations in streamflow that in turn re...
Abstract: The runoff coefficient, estimated as the ratio between quick flow and rainfall volume, on ...
The goal of this research was to develop a spatial-temporal model to forecast the snow water equival...
Due to the concern of downstream water users, the effect of a large number of small stock water rese...
149 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2001.Field-scale studies showed th...
Although this technical report does not specifically mention Waller Creek, the model construction an...
The prediction of rainstorms and floods in small and medium-sized watersheds, as well as the synthes...
CER68-69VY-GLS-MEH17.OWRR project no. B-005-COLO, period of research: July 1, 1966 - June 30, 1968.S...
CER72-73EFS-VY13.December 1, 1972.Includes bibliographical references (pages 11-12).OWRR project no....
Two independent hydrologic research projects, the development of (1) a research watershed system and...
This study was conducted in Pogung-Code sub watershed and Pulo-Opak sub watershed from 1993 to 2002....
This is a numerical prediction experiment of a watershed modeling system. A physically-based watersh...
This report embodies two principal objectives: 1) updating rainfall intensity-duration curves for th...
Soundly planned water resources development requires a knowledge of streamflow magnitudes and time p...
Watershed instrumentation system design consists of identifying the locations and types of stream ga...
Seasonal variations in precipitation on a watershed lead to variations in streamflow that in turn re...
Abstract: The runoff coefficient, estimated as the ratio between quick flow and rainfall volume, on ...
The goal of this research was to develop a spatial-temporal model to forecast the snow water equival...
Due to the concern of downstream water users, the effect of a large number of small stock water rese...
149 p.Thesis (Ph.D.)--University of Illinois at Urbana-Champaign, 2001.Field-scale studies showed th...
Although this technical report does not specifically mention Waller Creek, the model construction an...
The prediction of rainstorms and floods in small and medium-sized watersheds, as well as the synthes...
CER68-69VY-GLS-MEH17.OWRR project no. B-005-COLO, period of research: July 1, 1966 - June 30, 1968.S...