Document: "Pacific Southwest Water Plan- Corrected to 8/19" Chapter VI, August 19, 1964, page 17areas, provided that a marketing policy is established and maintained in such manner as to complement, rather than compete with, the objectives of full resource development in the Southwest. The transmission between the two load areas could utilize a highvoltage, direct-current system. Serious consideration should be given to this potential power source. Under current intensive study are proposed interties between the upper and lower Colorado River Basins and between the Colorado and Missouri River Basins. Preliminary indications are that significant mutual benefits may be achieved. Basis of Estimates of Water and Power Supplies The estimat...