Phase 1 facilities by October 1963, a supplemental appropriation will be required no later than March 15, 1963. Total cost of Phase 1 is estimated to be $6,000,000. Phase 2 would consist of an additional 300 c. f. s. outlet drainage conveyance channel through the Wellton-Mohawk area, possibly some additional drain tile in selected areas, reconstruction of the existing Gila River pilot channe1, 12 new wells with appurtenant discharge facilities in the South Gila Valley, and slight modification of gates at Imperial Dam. A flood control channel with protective dikes through the length of the Wellton-Mohawk Irrigation and Drainage District has been authorized. One dike of such a channel would protect the proposed new 300 c. f. s. outlet chan...