Supporting Material The above presentation outlines the plan set forth in the Task Force report of August 1963, reviews the comments received from the States and Federal agencies, presents a modified or Initial Plan for your approval, and indicates major steps proposed for implementing the plan. To more fully present the Pacific Southwest Water Plan, the Task Force report has been revised in its entirety, but along the lines of its original format, to reflect the modifications adopted as a result of State and Federal agency review. The modified report is attached. In the modified report the following chapters remain essentially unchanged: Chapter I - The Pacific Southwest; Chapter II - The Water Problem; Chapter III - Present Water Suppli...
Document: Pacific Southwest Water Plan- Proposed Draft Letter of Transmittal- Secretary to the Presi...
policies and it must adhere to sound financial requirements. It must provide for existing and future...
Document: Committee Print, Pacific Southwest Water Plan Section Analysis, page 55 PACIFIC SOUTHWEST...
Document: Pacific Southwest Water Plan, Draft of Report of Commissioner of Reclamation, December 20,...
Summary of Pacific Southwest Water Plan as Proposed in August 1963 Report As a background to a resu...
Outline of Report to Secretary 1. On August 26, 1963, proposed report transmitted to States: a. Br...
Memorandum: From Assistant Secretary- Water & Power Development, to Chairman, Task Force on the Paci...
Document: Basic Modification of Proposed Plan, 1963, page 2believed wise to limit the final report p...
for further study. Together the works proposed were designed to erase the existing water deficiencie...
Document: Pacific Southwest Water Plan "Printed Copy" Chapter VIII, August 26 ,1963 page 1CHAPTER V...
Document: "Pacific Southwest Water Plan- Corrected to 8/19" Chapter VIII, August 19, 1964, page 1CHA...
Document: Hand Corrected Copy of the "Summary of the Pacific Southwest Water Plan", August 1963, pag...
The task force report proposed an "immediate-action" program for early authorization and a "continui...
The task force report proposed an "immediate-action" program for early authorization and a "continui...
belongs to broad Federal research and demonstration programs, and these comments were concurred in d...
Document: Pacific Southwest Water Plan- Proposed Draft Letter of Transmittal- Secretary to the Presi...
policies and it must adhere to sound financial requirements. It must provide for existing and future...
Document: Committee Print, Pacific Southwest Water Plan Section Analysis, page 55 PACIFIC SOUTHWEST...
Document: Pacific Southwest Water Plan, Draft of Report of Commissioner of Reclamation, December 20,...
Summary of Pacific Southwest Water Plan as Proposed in August 1963 Report As a background to a resu...
Outline of Report to Secretary 1. On August 26, 1963, proposed report transmitted to States: a. Br...
Memorandum: From Assistant Secretary- Water & Power Development, to Chairman, Task Force on the Paci...
Document: Basic Modification of Proposed Plan, 1963, page 2believed wise to limit the final report p...
for further study. Together the works proposed were designed to erase the existing water deficiencie...
Document: Pacific Southwest Water Plan "Printed Copy" Chapter VIII, August 26 ,1963 page 1CHAPTER V...
Document: "Pacific Southwest Water Plan- Corrected to 8/19" Chapter VIII, August 19, 1964, page 1CHA...
Document: Hand Corrected Copy of the "Summary of the Pacific Southwest Water Plan", August 1963, pag...
The task force report proposed an "immediate-action" program for early authorization and a "continui...
The task force report proposed an "immediate-action" program for early authorization and a "continui...
belongs to broad Federal research and demonstration programs, and these comments were concurred in d...
Document: Pacific Southwest Water Plan- Proposed Draft Letter of Transmittal- Secretary to the Presi...
policies and it must adhere to sound financial requirements. It must provide for existing and future...
Document: Committee Print, Pacific Southwest Water Plan Section Analysis, page 55 PACIFIC SOUTHWEST...