Expert System for Contractor to Analyze Risk of Construction Projects in Indonesia is a consultation media to know the dominan factors on the construction project, and to know risk control actions that can take to minimize loss caused by that domi nan factors. Knowledge acquisition for design expert system was colleceted by a research to the experts which works in the contractors at Yogyakarta, Solo, Semarang, Bandung, and Jabotabek. Result of this research show that there are some differences opinion among the experts when they give an impact value to the internal or external risk factors, and the expert's experience factor apparently has a lot influences on that differences among them. After result of the examination made, expert system m...
A knowledge-based expert system with the acronym RASPE is developed as an application tool to help d...
The report consentrates on a case study concerning the development of expert systems for constructio...
Use of expert systems for Engineering applications is still in very primitive stages in Sri Lanka. H...
The model of RISK ANALYZER was implemented as Knowledge-based System for the purpose of undertaking ...
Abstract. Economic growth and development is the most important factor in the development of a count...
The main reason for the application of expert system in construction is to deal with the qualitative...
Work accident prevention is cheaper than responding responsively after an accident. Common problems ...
The construction industry is highly potential for the risk of failure. The probability of risk in th...
The most important part before carrying out the housing construction is to make an estimate of the B...
The success of a project is uncertain. There is a possibility that the project was successful or fai...
Poor project monitoring and control process has been identified as one of the main reasons for const...
In the world of construction, there are always risk factors. This risk has an enormous influence on ...
The growth of the national construction market is increasing from year to year in line with the high...
This study discusses the risks faced by contractors in the construction business in Yogyakarta and ...
Poor project monitoring and control process has been identified as one of the main reasons for const...
A knowledge-based expert system with the acronym RASPE is developed as an application tool to help d...
The report consentrates on a case study concerning the development of expert systems for constructio...
Use of expert systems for Engineering applications is still in very primitive stages in Sri Lanka. H...
The model of RISK ANALYZER was implemented as Knowledge-based System for the purpose of undertaking ...
Abstract. Economic growth and development is the most important factor in the development of a count...
The main reason for the application of expert system in construction is to deal with the qualitative...
Work accident prevention is cheaper than responding responsively after an accident. Common problems ...
The construction industry is highly potential for the risk of failure. The probability of risk in th...
The most important part before carrying out the housing construction is to make an estimate of the B...
The success of a project is uncertain. There is a possibility that the project was successful or fai...
Poor project monitoring and control process has been identified as one of the main reasons for const...
In the world of construction, there are always risk factors. This risk has an enormous influence on ...
The growth of the national construction market is increasing from year to year in line with the high...
This study discusses the risks faced by contractors in the construction business in Yogyakarta and ...
Poor project monitoring and control process has been identified as one of the main reasons for const...
A knowledge-based expert system with the acronym RASPE is developed as an application tool to help d...
The report consentrates on a case study concerning the development of expert systems for constructio...
Use of expert systems for Engineering applications is still in very primitive stages in Sri Lanka. H...