This is the author accepted manuscript. The final version is available from the Federation of Piling Specialists via http://www.fps.org.uk/fps/news/Crossrail%20Programme%20of%20Proceedings%20FINAL.pdfThis paper describes the use of the Observsational Method (OM) on three Crossrail station excavations. Firstly, at Tottenham Court Road, Western Ticket Hall excavation where a code compliant design was started. By the third excavation stage, it was realised that movements were less than predicted and an OM was introduced. This enabled the lowest level of strutting to be eliminated, leading to savings in both programme and costs. Secondly, at Canary Wharf Crossrail Station, an OM approach was envisaged before the start of construction, but was o...
This paper draws lessons learnt from a comprehensive case study in overconsolidated clay. Apart from...
A European Commission (EC) funded Sustainable Construction of Underground Infrastructure (SCOUT) pro...
The paper presents the design and construction of an elliptical excavation for Porto Light Metro. Du...
The new observational method framework with four design approaches was introduced in Ciria C760 (Cir...
Ground engineering in urban areas faces the great challenge of balancing the increasing demand for u...
Elimination of temporary propping on large underground transportation projects has been achieved thr...
Geotechnical engineering designs are often predefined before construction commences, in an attempt t...
Circular shafts are an integral component of infrastructure development schemes which exploit underg...
The construction of Crossrail Paddington station in London (between 2011 and 2018) required a large ...
Simplicity is at the heart of the observational method.1,2 Its basis is straightforward and it is an...
Simplicity is at the heart of the observational method.1,2 Its basis is straightforward and it is an...
At present, there are few well-documented case studies of circular shaft construction, making it dif...
In the past few decades, demand for construction in underground spaces has increased dramatically in...
The A2 tunnel in Maastricht has been built within a dry building pit with a maximum depth of 22 mete...
The Crossrail project is currently the largest construction undertaking in Europe. It includes ten n...
This paper draws lessons learnt from a comprehensive case study in overconsolidated clay. Apart from...
A European Commission (EC) funded Sustainable Construction of Underground Infrastructure (SCOUT) pro...
The paper presents the design and construction of an elliptical excavation for Porto Light Metro. Du...
The new observational method framework with four design approaches was introduced in Ciria C760 (Cir...
Ground engineering in urban areas faces the great challenge of balancing the increasing demand for u...
Elimination of temporary propping on large underground transportation projects has been achieved thr...
Geotechnical engineering designs are often predefined before construction commences, in an attempt t...
Circular shafts are an integral component of infrastructure development schemes which exploit underg...
The construction of Crossrail Paddington station in London (between 2011 and 2018) required a large ...
Simplicity is at the heart of the observational method.1,2 Its basis is straightforward and it is an...
Simplicity is at the heart of the observational method.1,2 Its basis is straightforward and it is an...
At present, there are few well-documented case studies of circular shaft construction, making it dif...
In the past few decades, demand for construction in underground spaces has increased dramatically in...
The A2 tunnel in Maastricht has been built within a dry building pit with a maximum depth of 22 mete...
The Crossrail project is currently the largest construction undertaking in Europe. It includes ten n...
This paper draws lessons learnt from a comprehensive case study in overconsolidated clay. Apart from...
A European Commission (EC) funded Sustainable Construction of Underground Infrastructure (SCOUT) pro...
The paper presents the design and construction of an elliptical excavation for Porto Light Metro. Du...