US Transportation Collection2000PDFOtherPolivka, Karla A.Faller, R.K.Sicking, D.L.Rohde, J. R.Reid, J. D.Holloway, J.C.Midwest Roadside Safety FacilityMidwest States Regional Pooled Fund ProgramUnited States. Department of Transportation. Federal Highway AdministrationMidwest States Regional Pooled Fund ProgramNebraskaCrash testsCurbsDesignGuardrail terminalsGuardrailsPickup trucksPostsSpacingSpeedSPR-3(017)MwRSF Research Report No. TRP-03-83-99SPR-3(017)Final Report 1997 - 2000A barrier system was developed for installation where W-beam is placed over curbs. The guardrail design was constructed with a 2.66-mm (12-gauge) thick W-beam rail totaling 53.34 m in length. The W-beam rail was supported by twenty-five W150 x 13.5 steel posts, each ...
14720742008Final ReportPDFTech ReportTRP-03-188-08SRP-3(017)Highway safetyGuardrailsSimulationCrash ...
2000Final ReportPDFTech ReportTRP-03-94-00SPR-3(017)Barriers (Roads)Guardrail transition sectionsHig...
A W-beam guardrail system was developed and successfully crash tested for use on a 2:1 foreslope. T...
009214962001Final ReportPDFTech ReportTRP-03-105-00CurbsDesignGuardrail terminalsGuardrailsImpact te...
7712581999Final Report 1999PDFTech ReportTRP-03-88-99SPR-3(017)Barrier free designCulvertsDegradatio...
PDFTech ReportFHWA/NC/2013-10HighwaysMedian barriersGuardrailsPerformance testsImpact testsCurbsBeam...
Development, testing, and evaluation of the Midwest Guardrail System were continued from the origina...
A 7.62-m long span guardrail system was developed for use over low-fill culverts. The long span desi...
007499711998Final ReportPDFTech ReportTRP-03-69-98SPR-3(017)Acceptance testsBarriers (Roads)Guardrai...
007499711998Final ReportPDFTech ReportTRP-03-69-98SPR-3(017)Acceptance testsBarriers (Roads)Guardrai...
A W-beam to thrie beam stiffness transition with a 102-mm (4- in.) tall concrete curb was developed ...
10995332008Final ReportPDFTech ReportTRP-03-199-08SPR-3(017)Highway safetyGuardrailsBarriers (Roads)...
2000Final Report 1997-1999PDFTech ReportTRP-03-95-00SPR-3(OI7)Crash avoidance systemsMedian barriers...
The last decade has witnessed an increase in the number and speed of vehicles on the roads; these si...
10994932007Final ReportPDFTech ReportTRP-03-183-07RPFP-02-02SPR-3(017)Acceptance testsAnchoragesGuar...
14720742008Final ReportPDFTech ReportTRP-03-188-08SRP-3(017)Highway safetyGuardrailsSimulationCrash ...
2000Final ReportPDFTech ReportTRP-03-94-00SPR-3(017)Barriers (Roads)Guardrail transition sectionsHig...
A W-beam guardrail system was developed and successfully crash tested for use on a 2:1 foreslope. T...
009214962001Final ReportPDFTech ReportTRP-03-105-00CurbsDesignGuardrail terminalsGuardrailsImpact te...
7712581999Final Report 1999PDFTech ReportTRP-03-88-99SPR-3(017)Barrier free designCulvertsDegradatio...
PDFTech ReportFHWA/NC/2013-10HighwaysMedian barriersGuardrailsPerformance testsImpact testsCurbsBeam...
Development, testing, and evaluation of the Midwest Guardrail System were continued from the origina...
A 7.62-m long span guardrail system was developed for use over low-fill culverts. The long span desi...
007499711998Final ReportPDFTech ReportTRP-03-69-98SPR-3(017)Acceptance testsBarriers (Roads)Guardrai...
007499711998Final ReportPDFTech ReportTRP-03-69-98SPR-3(017)Acceptance testsBarriers (Roads)Guardrai...
A W-beam to thrie beam stiffness transition with a 102-mm (4- in.) tall concrete curb was developed ...
10995332008Final ReportPDFTech ReportTRP-03-199-08SPR-3(017)Highway safetyGuardrailsBarriers (Roads)...
2000Final Report 1997-1999PDFTech ReportTRP-03-95-00SPR-3(OI7)Crash avoidance systemsMedian barriers...
The last decade has witnessed an increase in the number and speed of vehicles on the roads; these si...
10994932007Final ReportPDFTech ReportTRP-03-183-07RPFP-02-02SPR-3(017)Acceptance testsAnchoragesGuar...
14720742008Final ReportPDFTech ReportTRP-03-188-08SRP-3(017)Highway safetyGuardrailsSimulationCrash ...
2000Final ReportPDFTech ReportTRP-03-94-00SPR-3(017)Barriers (Roads)Guardrail transition sectionsHig...
A W-beam guardrail system was developed and successfully crash tested for use on a 2:1 foreslope. T...