Oncor Electric Delivery Company, LLC (Oncor) is planning to construct the Owl Hills—Tunstill 138-kV Transmission Line Route in Culberson, Reeves and Loving Counties, Texas. Oncor contracted with Halff Associates, Inc. to conduct an intensive pedestrian survey of 18.5 miles of new 138-kV transmission line on private property. The survey was conducted January 20-24, 2020 and a total of 102 shovel tests were excavated in areas where buried archeological deposits where expected, and two 15-meter (32.8-foot) transects underwent pedestrian survey within the 70-foot (21.3-meter) wide survey corridor, which measures approximately 157 acres. Three archeological sites (41RV208, 41RV209 and 41RV213) were identified and recorded during the archeologica...
Terracon Consultants, Inc. (Terracon) was contracted by PNM Resources to conduct a Phase I archeolog...
On behalf of River City Engineering and Canyon Regional Water Authority (CRWA), SWCA Environmental C...
Lorena Tax Increment Reinvestment Zone (TIRZ) #1 East has proposed the TIRZ #1 East Phase 1 Trunk Li...
Oncor Electric Delivery Company, LLC is planning to construct the Balding POD 138-kV Transmission Li...
At the request of American Electric Power, Blanton & Associates, Inc., conducted a non-collection ar...
Oncor Electric Delivery Company LLC (Oncor) has contracted with HDR, Inc. (HDR) to conduct an intens...
On June 14-15, 2017, an intensive archeological survey was completed in order to evaluate potential ...
The Texas and New Mexico Power Company (TNMP) is proposing to rebuild a 69 kV transmission line from...
Oncor Electric Delivery LLC (Oncor) contracted with HDR Engineering, Inc. (HDR) to conduct an intens...
On February 3 of 2016, and on March 1 and 2 of 2017, archeologists from aci consulting conducted a p...
In August 1981, the Center for Archaeological Research, The University of Texas at San Antonio, cond...
SWCA Environmental Consultants (SWCA) conducted a cultural resources investigation on behalf of CPS ...
An archaeological survey was conducted of power line routes near Uvalde and Blewett in Uvalde and Ki...
At the request of Salt Creek Midstream (SCM), Flatrock Engineering and Environmental, LLC (Flatrock)...
At the request of Salt Creek Midstream (SCM), Flatrock Engineering and Environmental, LLC (Flatrock)...
Terracon Consultants, Inc. (Terracon) was contracted by PNM Resources to conduct a Phase I archeolog...
On behalf of River City Engineering and Canyon Regional Water Authority (CRWA), SWCA Environmental C...
Lorena Tax Increment Reinvestment Zone (TIRZ) #1 East has proposed the TIRZ #1 East Phase 1 Trunk Li...
Oncor Electric Delivery Company, LLC is planning to construct the Balding POD 138-kV Transmission Li...
At the request of American Electric Power, Blanton & Associates, Inc., conducted a non-collection ar...
Oncor Electric Delivery Company LLC (Oncor) has contracted with HDR, Inc. (HDR) to conduct an intens...
On June 14-15, 2017, an intensive archeological survey was completed in order to evaluate potential ...
The Texas and New Mexico Power Company (TNMP) is proposing to rebuild a 69 kV transmission line from...
Oncor Electric Delivery LLC (Oncor) contracted with HDR Engineering, Inc. (HDR) to conduct an intens...
On February 3 of 2016, and on March 1 and 2 of 2017, archeologists from aci consulting conducted a p...
In August 1981, the Center for Archaeological Research, The University of Texas at San Antonio, cond...
SWCA Environmental Consultants (SWCA) conducted a cultural resources investigation on behalf of CPS ...
An archaeological survey was conducted of power line routes near Uvalde and Blewett in Uvalde and Ki...
At the request of Salt Creek Midstream (SCM), Flatrock Engineering and Environmental, LLC (Flatrock)...
At the request of Salt Creek Midstream (SCM), Flatrock Engineering and Environmental, LLC (Flatrock)...
Terracon Consultants, Inc. (Terracon) was contracted by PNM Resources to conduct a Phase I archeolog...
On behalf of River City Engineering and Canyon Regional Water Authority (CRWA), SWCA Environmental C...
Lorena Tax Increment Reinvestment Zone (TIRZ) #1 East has proposed the TIRZ #1 East Phase 1 Trunk Li...