The article of record as published may be found at http://dx.doi.org/10.1115/DETC2018-85490Proceedings of the ASME 2018 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference IDETC/CIE 2018 August 26-29, 2018, Quebec City, Quebec, CanadaA challenge systems engineers and designers face when applying system failure risk assessment methods such as Probabilistic Risk Assessment (PRA) during conceptual design is their reliance on historical data and behavioral models. This paper presents a framework for exploring a space of functional models using graph rewriting rules and a qualitative failure simulation framework that presents information in an intuitive manner for human-in-the-loop...
Most decisions about a product, i.e. form, function, aesthetics, etc, are made during the conceptual...
Click on the DOI link to access the article (may not be free).The continuous pursuits of developing ...
When designing a product the earlier the potential risks can be identified, the more costs can be sa...
The article of record as published may be found at https://doi.org/10.1115/1.4042913A challenge syst...
An open area of research for complex, cyber-physical systems is how to adequately support decision m...
An open area of research for complex, cyber-physical systems is how to adequately support decision m...
17 USC 105 interim-entered record; under review.The article of record as published may be found at h...
Graduation date: 2009For safety critical complex systems, reliability and risk analysis are importan...
Graduation date: 2017In order to more effectively design large, complex systems, risk must be accoun...
This paper presents a framework to quantify failure propagation potential for complex, cyber-physica...
The complexity in most engineering systems is constantly growing due to ever-increasing technologica...
This is an author's peer-reviewed final manuscript, as accepted by the publisher. The published arti...
Graduation date: 2013An open area of research in complex systems is to move reliability and failure ...
Prognostics and Health Management (PHM) systems are usually only considered and set up in the late s...
Most decisions about a product, i.e. form, function, aesthetics, etc, are made during the conceptual...
Most decisions about a product, i.e. form, function, aesthetics, etc, are made during the conceptual...
Click on the DOI link to access the article (may not be free).The continuous pursuits of developing ...
When designing a product the earlier the potential risks can be identified, the more costs can be sa...
The article of record as published may be found at https://doi.org/10.1115/1.4042913A challenge syst...
An open area of research for complex, cyber-physical systems is how to adequately support decision m...
An open area of research for complex, cyber-physical systems is how to adequately support decision m...
17 USC 105 interim-entered record; under review.The article of record as published may be found at h...
Graduation date: 2009For safety critical complex systems, reliability and risk analysis are importan...
Graduation date: 2017In order to more effectively design large, complex systems, risk must be accoun...
This paper presents a framework to quantify failure propagation potential for complex, cyber-physica...
The complexity in most engineering systems is constantly growing due to ever-increasing technologica...
This is an author's peer-reviewed final manuscript, as accepted by the publisher. The published arti...
Graduation date: 2013An open area of research in complex systems is to move reliability and failure ...
Prognostics and Health Management (PHM) systems are usually only considered and set up in the late s...
Most decisions about a product, i.e. form, function, aesthetics, etc, are made during the conceptual...
Most decisions about a product, i.e. form, function, aesthetics, etc, are made during the conceptual...
Click on the DOI link to access the article (may not be free).The continuous pursuits of developing ...
When designing a product the earlier the potential risks can be identified, the more costs can be sa...