Panel #18: Cost and Pricing in the 21st CenturyNaval Postgraduate SchoolApproved for public release; distribution is unlimited
This research analyzed the practices associated with maintaining a safety stock of secondary reparab...
Prepared for the Naval Postgraduate School, Monterey, CA 93943.Naval Postgraduate SchoolApproved for...
MBA Professional ProjectThe Department of Defense (DoD) budget is the end product of the Planning, P...
Panel #18: Cost and Pricing in the 21st CenturyAcquisition Research: Creating Synergy for Informed C...
The Marine Corps relies on advanced ground equipment that requires significant depot-level maintenan...
The purpose of this thesis is to evaluate the current practice for budget estimation and resource al...
For decades, operation and maintenance (O&M) has been growing as a share of the defense budget. To u...
MBA Professional ReportThe Navy Reserve budgets for the annual training of officers and enlisted in ...
There is a widely accepted notion that fiscal spending increases at the end of the fiscal year acros...
The Marine Corps manages a centralized secondary reparable inventory of over 1,000 different items w...
The Marine Corps currently utilizes a traditional time-based strategy for ground equipment maintenan...
Discerning, negotiating, and communicating priorities are necessary tasks for the U.S. defense acqui...
NPS NRP Executive SummaryAviation Depot Maintenance Throughput OptimizationN8 - Integration of Capab...
Panel #16: Improving Schedule Estimates in MDAPSNaval Postgraduate SchoolApproved for public release...
The budget is the end product of the Planning, Programming, Budgeting, and Execution process, which ...
This research analyzed the practices associated with maintaining a safety stock of secondary reparab...
Prepared for the Naval Postgraduate School, Monterey, CA 93943.Naval Postgraduate SchoolApproved for...
MBA Professional ProjectThe Department of Defense (DoD) budget is the end product of the Planning, P...
Panel #18: Cost and Pricing in the 21st CenturyAcquisition Research: Creating Synergy for Informed C...
The Marine Corps relies on advanced ground equipment that requires significant depot-level maintenan...
The purpose of this thesis is to evaluate the current practice for budget estimation and resource al...
For decades, operation and maintenance (O&M) has been growing as a share of the defense budget. To u...
MBA Professional ReportThe Navy Reserve budgets for the annual training of officers and enlisted in ...
There is a widely accepted notion that fiscal spending increases at the end of the fiscal year acros...
The Marine Corps manages a centralized secondary reparable inventory of over 1,000 different items w...
The Marine Corps currently utilizes a traditional time-based strategy for ground equipment maintenan...
Discerning, negotiating, and communicating priorities are necessary tasks for the U.S. defense acqui...
NPS NRP Executive SummaryAviation Depot Maintenance Throughput OptimizationN8 - Integration of Capab...
Panel #16: Improving Schedule Estimates in MDAPSNaval Postgraduate SchoolApproved for public release...
The budget is the end product of the Planning, Programming, Budgeting, and Execution process, which ...
This research analyzed the practices associated with maintaining a safety stock of secondary reparab...
Prepared for the Naval Postgraduate School, Monterey, CA 93943.Naval Postgraduate SchoolApproved for...
MBA Professional ProjectThe Department of Defense (DoD) budget is the end product of the Planning, P...