Subsea templates are normally transported to the installation site on the deck of a crane vessel. After being lifted off from the deck, the template is 1) over-boarded from the initial location to the target position by the side of the vessel; 2) lowered through the splash zone; 3) further lowered down to the seabed and 4) finally positioned and landed. All the mentioned phases should be evaluated. The over-boarding phase has not been the focus of analysis due to a large involvement of human actions and little involvement of hydrodynamic effects. During offshore operations, the offshore manager may decide to decrease the defined installation weather criterion if the risk of the personnel safety on deck during the over-boarding phase is cons...
Master's thesis in Marine and Offshore TechnologyThe lift-off operation faces great operational chal...
Accurate predictions of the hydrodynamic loads experienced by offshore structures with large horizon...
Accurate predictions of the hydrodynamic loads experienced by offshore structures with large horizon...
Master's thesis in Offshore technologySubsea templates are normally transported to the installation ...
External loads on a free-floating vessel affect the vessel responses in waves. DNV’s recommended pra...
Two different templates, template A and template B, for subsea oil and gas production are studied in...
For oil and gas fields moving further offshore, it has been more common to use a subsea production s...
Master's thesis in Offshore technology: Marine and Subsea TechnologyWithin the scope of marine opera...
This study compares deployment of a subsea template simulated as a coupled model and as an uncoupled...
The oil and gas industry has become more challenging the past years and marine operations must be pe...
This study compares deployment of a subsea template simulated as a coupled model and as an uncoupled...
External loads on a free-floating vessel affect the vessel responses in waves. DNV’s recommended pra...
ABSTRACT The installations of sub-sea equipments are very complex operations, requiring previous ana...
The lift-off operation faces great operational challenges due to the harsh environment in the North ...
This thesis carries out a research on the dynamic performance of the template during the lowing oper...
Master's thesis in Marine and Offshore TechnologyThe lift-off operation faces great operational chal...
Accurate predictions of the hydrodynamic loads experienced by offshore structures with large horizon...
Accurate predictions of the hydrodynamic loads experienced by offshore structures with large horizon...
Master's thesis in Offshore technologySubsea templates are normally transported to the installation ...
External loads on a free-floating vessel affect the vessel responses in waves. DNV’s recommended pra...
Two different templates, template A and template B, for subsea oil and gas production are studied in...
For oil and gas fields moving further offshore, it has been more common to use a subsea production s...
Master's thesis in Offshore technology: Marine and Subsea TechnologyWithin the scope of marine opera...
This study compares deployment of a subsea template simulated as a coupled model and as an uncoupled...
The oil and gas industry has become more challenging the past years and marine operations must be pe...
This study compares deployment of a subsea template simulated as a coupled model and as an uncoupled...
External loads on a free-floating vessel affect the vessel responses in waves. DNV’s recommended pra...
ABSTRACT The installations of sub-sea equipments are very complex operations, requiring previous ana...
The lift-off operation faces great operational challenges due to the harsh environment in the North ...
This thesis carries out a research on the dynamic performance of the template during the lowing oper...
Master's thesis in Marine and Offshore TechnologyThe lift-off operation faces great operational chal...
Accurate predictions of the hydrodynamic loads experienced by offshore structures with large horizon...
Accurate predictions of the hydrodynamic loads experienced by offshore structures with large horizon...