The paper deals with a two-stage hybrid flowshop problem with one machine in the first stage and two different machines in parallel in the second one. The objective of scheduling such a problem is to minimize the makespan. We demonstrate that the problem is NP-complete. We formulate a dynamic program, which is beyond our grasp for problems of more than 15 jobs. We have conducted experimentation to evaluate the time performance the dynamic programming procedure for "small size" problems.We treat the n-job, two-stage hybrid flowshop problem with one machine in the first stage and two different machines in parallel in the second stage. The objective is to minimize the makespan. We demonstrate that the problem is NP-complete. We formulate a dyn...
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are p...
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unr...
This research addresses a complex hybrid flowshop (HFS) scheduling problem confronted in a real indu...
This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
This paper considers the hybrid flow shop scheduling problem. Most real world scheduling problems ar...
Abstract. The goal of this paper is to investigate scheduling heuristics to seek the minimum of a po...
[[abstract]]We consider a two-machine flowshop sequencing problem with limited waiting time constrai...
This research aims at a study of the hybrid flow shop problem which has parallel batch-processing ma...
This research aims at a study of the hybrid flow shop problem which has parallel batch-processing ma...
Scheduling problems may be encountered in many situations in everyday life. Organizing daily activit...
Scheduling problems may be encountered in many situations in everyday life. Organizing daily activit...
The scheduling of flow shops with multiple parallel machines per stage, usually referred to as the H...
In a general flow-shop situation, where all the jobs must pass through all the machines in the same ...
In recent years, many studies on scheduling problems with dedicated machines have been carried out. ...
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are p...
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unr...
This research addresses a complex hybrid flowshop (HFS) scheduling problem confronted in a real indu...
This paper considers a two-stage hybrid flow shop scheduling problem for the objective of minimizing...
Minimising makespan aims to achieve high utilisation of equipment and resources by getting all jobs ...
This paper considers the hybrid flow shop scheduling problem. Most real world scheduling problems ar...
Abstract. The goal of this paper is to investigate scheduling heuristics to seek the minimum of a po...
[[abstract]]We consider a two-machine flowshop sequencing problem with limited waiting time constrai...
This research aims at a study of the hybrid flow shop problem which has parallel batch-processing ma...
This research aims at a study of the hybrid flow shop problem which has parallel batch-processing ma...
Scheduling problems may be encountered in many situations in everyday life. Organizing daily activit...
Scheduling problems may be encountered in many situations in everyday life. Organizing daily activit...
The scheduling of flow shops with multiple parallel machines per stage, usually referred to as the H...
In a general flow-shop situation, where all the jobs must pass through all the machines in the same ...
In recent years, many studies on scheduling problems with dedicated machines have been carried out. ...
In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are p...
This paper deals with the problem of preemptive scheduling in a two-stage flowshop with parallel unr...
This research addresses a complex hybrid flowshop (HFS) scheduling problem confronted in a real indu...