Earned value management (EVM) is a methodology for evaluating project performance and progress by integrating project scope, schedule, and cost. EVM has been widely applied in various industrial sectors and many studies have been conducted on EVM and its application in the industry. This paper provides an analytic review of EVM studies and its applications. EVM studies published in a number of sources are reviewed. These studies are classified as either empirical or non-empirical. For empirical studies, key issues reviewed include effective implementation of EVM, behaviors of cost performance index, accuracy of cost control techniques, and accuracy of time control techniques. For non-empirical studies, key issues reviewed include schedule p...
Earned Value Management is not a new technique in the construction industry and other sectors. Almos...
Project cost and schedule are the most essential governing factor for the successful completion of p...
Earn Value Management is a globally accepted and well established integrated planning and control m...
Earned Value Management (EVM) is a methodology that combines scope, schedule, and resource measureme...
With the inevitable increase in size and complexity of construction projects, the need for proper co...
Earned Value Management (EVM) is a methodology that combines scope, schedule, and resource measureme...
This study is based on the Earned Value Management (EVM) performance measurement technique and its p...
In most of the construction projects it has been notice that certain causes may lead to delay in con...
Earned Value Management (EVM) is a methodology that combines scope, schedule, and resource measureme...
The primary purpose of the current study is introducing a comprehensive approach to identify the rel...
The implementation of earned value management (EVM) in the construction industry faces challenges wh...
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements ...
The Earned Value Management (EVM) is a fully integrated project cost-and-schedule controlsystem that...
This paper presents a review of an Earned Value Management System (EVM) for assessing project perfor...
The management of construction projects are becoming more challenging for civil engineers in the 21s...
Earned Value Management is not a new technique in the construction industry and other sectors. Almos...
Project cost and schedule are the most essential governing factor for the successful completion of p...
Earn Value Management is a globally accepted and well established integrated planning and control m...
Earned Value Management (EVM) is a methodology that combines scope, schedule, and resource measureme...
With the inevitable increase in size and complexity of construction projects, the need for proper co...
Earned Value Management (EVM) is a methodology that combines scope, schedule, and resource measureme...
This study is based on the Earned Value Management (EVM) performance measurement technique and its p...
In most of the construction projects it has been notice that certain causes may lead to delay in con...
Earned Value Management (EVM) is a methodology that combines scope, schedule, and resource measureme...
The primary purpose of the current study is introducing a comprehensive approach to identify the rel...
The implementation of earned value management (EVM) in the construction industry faces challenges wh...
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements ...
The Earned Value Management (EVM) is a fully integrated project cost-and-schedule controlsystem that...
This paper presents a review of an Earned Value Management System (EVM) for assessing project perfor...
The management of construction projects are becoming more challenging for civil engineers in the 21s...
Earned Value Management is not a new technique in the construction industry and other sectors. Almos...
Project cost and schedule are the most essential governing factor for the successful completion of p...
Earn Value Management is a globally accepted and well established integrated planning and control m...