Local scour around bridge piers is known for being an important factor threatening the safety of bridges. It is related to the subjects of turbulence, vortex, sediment transport, and others. Because of the random nature and complexity of the scouring phenomenon around bridge piers, the risk of failure due to excessive local scour around a pier during its service life always exists. Thus, the time-dependent reliability analysis of local scour is important in designing new bridges and in evaluating the vulnerability of existing bridges to local scour. There have been numerous empirical formulae developed in the past to estimate the maximum scour depth under the conditions of live-bed scour or clear-water scour, whereas still little work has b...
Scour at a bridge pier is the formation of a hole around the pier due to the erosion of soil by flow...
The design of bridge piers placed in riverbeds has to deal with variable hydraulic forces acting on ...
NCHRP Project 24-34 was completed in September 2013 with the publication of NCHRP Report 761, Refer...
Reliability-based assessment of local scouring mechanism around bridge piers provides information fo...
Excessive local scour around piers and abutments is known as a major cause of bridge failure induced...
Scouring at the base of bridge piers is the major cause of bridge collapses worldwide. Computing the...
Many bridges crossing wide rivers fail due to excessive local scour around piers and abutments durin...
Bridge scour is an extremely complex phenomenon because of the random characteristics of sediment la...
Many bridges crossing wide rivers fail due to excessive local scour around piers and abutments durin...
Reliability-based assessment of local scouring mechanism around bridge piers provides information fo...
Bridge pier scour is an important engineering concern because of the role that it can play on the sa...
Estimation of maximum possible scour depth around bridge piers is an important step in the design of...
Deterministic scour prediction equations for bridge abutments consider only the effects of hydraulic...
The local scour around bridge piers influences their stabilities and plays a key role in the bridge ...
Local scour is a dynamic process evolving during the lifetime of bridges as a result of the changes ...
Scour at a bridge pier is the formation of a hole around the pier due to the erosion of soil by flow...
The design of bridge piers placed in riverbeds has to deal with variable hydraulic forces acting on ...
NCHRP Project 24-34 was completed in September 2013 with the publication of NCHRP Report 761, Refer...
Reliability-based assessment of local scouring mechanism around bridge piers provides information fo...
Excessive local scour around piers and abutments is known as a major cause of bridge failure induced...
Scouring at the base of bridge piers is the major cause of bridge collapses worldwide. Computing the...
Many bridges crossing wide rivers fail due to excessive local scour around piers and abutments durin...
Bridge scour is an extremely complex phenomenon because of the random characteristics of sediment la...
Many bridges crossing wide rivers fail due to excessive local scour around piers and abutments durin...
Reliability-based assessment of local scouring mechanism around bridge piers provides information fo...
Bridge pier scour is an important engineering concern because of the role that it can play on the sa...
Estimation of maximum possible scour depth around bridge piers is an important step in the design of...
Deterministic scour prediction equations for bridge abutments consider only the effects of hydraulic...
The local scour around bridge piers influences their stabilities and plays a key role in the bridge ...
Local scour is a dynamic process evolving during the lifetime of bridges as a result of the changes ...
Scour at a bridge pier is the formation of a hole around the pier due to the erosion of soil by flow...
The design of bridge piers placed in riverbeds has to deal with variable hydraulic forces acting on ...
NCHRP Project 24-34 was completed in September 2013 with the publication of NCHRP Report 761, Refer...