With the technological progress of wireless technologies, an alternative avionic communication architecture based on wireless connectivity has been proposed to cope with the emerging avionics issues, i.e., reducing weight and costs. The performance analysis of such a proposal is conducted herein to quantify the impact of unreliable wireless links on transmission delays, and the efficiency of retransmission-based mechanisms to enhance the system reliability. First, an adequate system modeling, based on Stochastic Network Calculus, to capture the loss process of unreliable links is detailed. Then, stochastic end-to-end delay bounds are analyzed. Finally, the introduced approach is illustrated through a representative avionics case study. N...
Abstract—During the last two decades, starting with the seminal work by Cruz, network calculus has e...
Performance evaluation plays a fundamental role in the design of modern underwater wireless communic...
Deterministic network calculus (DNC) is not suitable for deriving performance guarantees for wireles...
AFDX (Avionics Full Duplex Switched Ethernet, AR-INC 664) developed for the Airbus A380 represents a...
The VL (Virtual Link) concept used by AFDX network of modern aircraft such as A380 represents a big ...
To reduce the aircraft weight and maintenance costs while guaranteeing system performance and reliab...
Reliability is a major concern for avionic systems. The risks in their design can be minimized by us...
New features are often added incrementally to avionics systems. This avoids redesign and recertifica...
Avionics systems are subject to hard real-time constrainst and criticality. To certify these systems...
Les architectures de communication avionique actuelles impliquent un poids et des coûts d'intégratio...
Avionics implementation with less cables will clearly improve the efficiency of aircraft while reduc...
In this paper we provide a performance analysis framework for wireless industrial networks by derivi...
WirelessHART networks are gaining ground as a real-time communication infrastructure in industrial w...
In this paper we provide a performance analysis framework for wireless industrial networks by derivi...
In this paper, with the aid of the mathematical tool of stochastic geometry, we introduce analytical...
Abstract—During the last two decades, starting with the seminal work by Cruz, network calculus has e...
Performance evaluation plays a fundamental role in the design of modern underwater wireless communic...
Deterministic network calculus (DNC) is not suitable for deriving performance guarantees for wireles...
AFDX (Avionics Full Duplex Switched Ethernet, AR-INC 664) developed for the Airbus A380 represents a...
The VL (Virtual Link) concept used by AFDX network of modern aircraft such as A380 represents a big ...
To reduce the aircraft weight and maintenance costs while guaranteeing system performance and reliab...
Reliability is a major concern for avionic systems. The risks in their design can be minimized by us...
New features are often added incrementally to avionics systems. This avoids redesign and recertifica...
Avionics systems are subject to hard real-time constrainst and criticality. To certify these systems...
Les architectures de communication avionique actuelles impliquent un poids et des coûts d'intégratio...
Avionics implementation with less cables will clearly improve the efficiency of aircraft while reduc...
In this paper we provide a performance analysis framework for wireless industrial networks by derivi...
WirelessHART networks are gaining ground as a real-time communication infrastructure in industrial w...
In this paper we provide a performance analysis framework for wireless industrial networks by derivi...
In this paper, with the aid of the mathematical tool of stochastic geometry, we introduce analytical...
Abstract—During the last two decades, starting with the seminal work by Cruz, network calculus has e...
Performance evaluation plays a fundamental role in the design of modern underwater wireless communic...
Deterministic network calculus (DNC) is not suitable for deriving performance guarantees for wireles...