This thesis investigates the problem of scheduling and routing employees that are required to perform activities at clients’ locations. Clients request the activities to be performed during a time period. Employees are required to have the skills and qualifications necessary to perform their designated activities. The working time of employees must be respected. Activities could require more than one employee. Additionally, an activity might have time-dependent constraints with other activities. Time-dependent activities constraints include: synchronisation, when two activities need to start at the same time; overlap, if at any time two activities are being performed simultaneously; and with a time difference between the start of the two ac...
This thesis studies three routing and scheduling problems arising in manpower and transportation pla...
This thesis investigates solution methodologies for concrete combinatorial problems in scheduling an...
In this paper we present a heuristic approach for solving workforce scheduling problems. The primary...
We present a greedy heuristic (GHI) designed to tackle five time-dependent activities constraints (s...
The Workforce Scheduling and Routing Problem deals with the assignment of work¬ers to tasks througho...
This paper presents an investigation into the application of heuristic decomposition and mixed-integ...
We present a computational study on 112 instances of the Workforce Scheduling and Routing Problem (W...
In the context of workforce scheduling, there are many scenarios in which personnel must carry out t...
This thesis presents a PhD research project using a mathematical programming approach to solve a hom...
In the context of workforce scheduling, there are many scenarios in which personnel must carry out t...
Abstract: In this paper we present a computational study on 112 instances of the workforce schedulin...
We present a mixed integer programming decomposition approach to tackle workforce scheduling and rou...
This thesis studies three routing and scheduling problems arising in manpower and transportation pla...
We propose an approach based on mixed integer programming (MIP) with decomposition to solve a workfo...
The workforce scheduling and routing problem (WSRP) arises in many scenarios in which skilled worker...
This thesis studies three routing and scheduling problems arising in manpower and transportation pla...
This thesis investigates solution methodologies for concrete combinatorial problems in scheduling an...
In this paper we present a heuristic approach for solving workforce scheduling problems. The primary...
We present a greedy heuristic (GHI) designed to tackle five time-dependent activities constraints (s...
The Workforce Scheduling and Routing Problem deals with the assignment of work¬ers to tasks througho...
This paper presents an investigation into the application of heuristic decomposition and mixed-integ...
We present a computational study on 112 instances of the Workforce Scheduling and Routing Problem (W...
In the context of workforce scheduling, there are many scenarios in which personnel must carry out t...
This thesis presents a PhD research project using a mathematical programming approach to solve a hom...
In the context of workforce scheduling, there are many scenarios in which personnel must carry out t...
Abstract: In this paper we present a computational study on 112 instances of the workforce schedulin...
We present a mixed integer programming decomposition approach to tackle workforce scheduling and rou...
This thesis studies three routing and scheduling problems arising in manpower and transportation pla...
We propose an approach based on mixed integer programming (MIP) with decomposition to solve a workfo...
The workforce scheduling and routing problem (WSRP) arises in many scenarios in which skilled worker...
This thesis studies three routing and scheduling problems arising in manpower and transportation pla...
This thesis investigates solution methodologies for concrete combinatorial problems in scheduling an...
In this paper we present a heuristic approach for solving workforce scheduling problems. The primary...