This memorandum outlines procedures for the approval of basic circuits for AN/FSQ-7
Program for development of phone line specifications for reliable data transmission to be carried ou...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
A meeting of the Joint IBM-MIT Standards Committee on Materials and Processes, held June 4 at M.I.T....
This memorandum lists the functions of the Division 6 scheduling office for the AN/FSQ-7 Program
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Includes: introduction; specifications; and summary reference list.The AN/FSQ--7 specifications for ...
Includes: introduction; changes; and referenced documents.The specifications for the Central Compute...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Includes: introduction; specifications; and referenced documents.The AN/FSQ-7 specifications for the...
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Principal work during this period has been concerned with the display systems development and reduct...
Present: J. W. Forrester, D. R. Brown, S. H. Dodd, R. R. Everett, A. P. Kromer, J. C. Proctor, N. H....
The 4th Meeting of the MIT-IBM Central Standards Committee was held Friday, Aug. 14, 1953 at MIT. ...
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development ...
Program for development of phone line specifications for reliable data transmission to be carried ou...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
A meeting of the Joint IBM-MIT Standards Committee on Materials and Processes, held June 4 at M.I.T....
This memorandum lists the functions of the Division 6 scheduling office for the AN/FSQ-7 Program
This memorandum outlines procedures for communication between MIT and IBM for work on the AN/FSQ-7 P...
Includes: introduction; specifications; and summary reference list.The AN/FSQ--7 specifications for ...
Includes: introduction; changes; and referenced documents.The specifications for the Central Compute...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Includes: introduction; specifications; and referenced documents.The AN/FSQ-7 specifications for the...
Includes: introduction; equipment and logical functions submitted for acceptance; results of accepta...
Principal work during this period has been concerned with the display systems development and reduct...
Present: J. W. Forrester, D. R. Brown, S. H. Dodd, R. R. Everett, A. P. Kromer, J. C. Proctor, N. H....
The 4th Meeting of the MIT-IBM Central Standards Committee was held Friday, Aug. 14, 1953 at MIT. ...
Collaboration between Lincoln and IBM engineering groups has continued on all phases of development ...
Program for development of phone line specifications for reliable data transmission to be carried ou...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
A meeting of the Joint IBM-MIT Standards Committee on Materials and Processes, held June 4 at M.I.T....