Each document includes: IBM and/or MIT document numbers; title; date of IBM-MIT concurrence and/or Lincoln release; Lincoln Laboratory Division VI Document Room file number; and a coded "status and/or required" column.Compilation of all the active technical specification documents which received Lincoln-IBM concurrence for AN/FSQ-7, XD-1 design. The list is a revision of the previous list, 6M-3851-3 and its supplements, and was brought up to date as of 17 April 1957
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Active consideration is being given to having IBM - Endicott take on the engineering responsibility ...
Includes: No. 6R, Title, Date, Author, and Cls.List of Project Whirlwind R-series memorandums, numbe...
Each document includes: IBM and/or MIT document numbers; title, author, and date; date of IBM-MIT co...
Technical Information Releases were used for equipment specifications and operational specifications...
Includes: introduction; specifications; and summary reference list.The AN/FSQ--7 specifications for ...
Meeting attendants: J. W. Forrester, H. E. Anderson, H. D. Bennington, D. R. Brown, R. J. Buzzard, S...
Discusses construction of the XD-1 prototype system, engineering refinement of design, initial insta...
Includes: introduction; changes; and referenced documents.The specifications for the Central Compute...
Listed: name, number, room, group, and classification.Includes: telephone key, personnel listing, su...
Present: (MIT) S. H. Dodd, R. R. Everett, J. W. Forrester, M. G. Holloway, B. E. Morriss, J. A. O'Br...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
A conference reached agreement on the display specifications. They are presently being written up fo...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Active consideration is being given to having IBM - Endicott take on the engineering responsibility ...
Includes: No. 6R, Title, Date, Author, and Cls.List of Project Whirlwind R-series memorandums, numbe...
Each document includes: IBM and/or MIT document numbers; title, author, and date; date of IBM-MIT co...
Technical Information Releases were used for equipment specifications and operational specifications...
Includes: introduction; specifications; and summary reference list.The AN/FSQ--7 specifications for ...
Meeting attendants: J. W. Forrester, H. E. Anderson, H. D. Bennington, D. R. Brown, R. J. Buzzard, S...
Discusses construction of the XD-1 prototype system, engineering refinement of design, initial insta...
Includes: introduction; changes; and referenced documents.The specifications for the Central Compute...
Listed: name, number, room, group, and classification.Includes: telephone key, personnel listing, su...
Present: (MIT) S. H. Dodd, R. R. Everett, J. W. Forrester, M. G. Holloway, B. E. Morriss, J. A. O'Br...
Present: (IBM) F. A. Behnke, R. A. Imm, R. C. Eisele, M. C. Portanova; (MIT) J. D. Crane, E. L. Smil...
Present: (IBM) B. Housman, R. W. Lowrie, R. C. Marden, D. C. Ross, C. E. Walston; (MIT) J. Giordano,...
A conference reached agreement on the display specifications. They are presently being written up fo...
Specifications for the display system, the power system and the internal memory will be prepared. Ou...
MIT-IBM engineering concurrence has been reached on requests for DC buildings, equipment cooling, li...
Active consideration is being given to having IBM - Endicott take on the engineering responsibility ...
Includes: No. 6R, Title, Date, Author, and Cls.List of Project Whirlwind R-series memorandums, numbe...