This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimising the open-pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is analysed based on the real-life data from an Australian iron ore mine site. The objective of the model is to maximise the throughput and minimise the total idle times of equipment at each stage. The following comprehensive mining attributes and constraints are considered: types of equipment; operating capacities of equipment; ready times of equipment; speeds of equipment; block-sequence-dependent movement times; equipment-assignment-dependent operational times; etc. The model also provides the availability and usage of equip...
Ore beneficiation at a mine could be described as complex and expensive, involving many balancing pr...
Current mine production planning, scheduling, and allocation of resources are based on mathematical ...
MIng (Mechanical Engineering), Potchefstroom University for Christian Higher Education, 2003The focu...
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimis...
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit ...
This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit ...
In the literature of mining optimisation, most classical mine block sequencing or open-pit mine prod...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
Mining is a complex, expensive, yet lucrative business. Today's open-pit mines are huge projects in ...
Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained...
A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine p...
The extraction of ore from a mine must be scheduled to meet specific order production targets or `bu...
The open pit mine production scheduling problem (OPMPSP) is a well-known combinatorial optimization ...
This paper summarizes a research to develop an optimization algorithm used to support short term pla...
Underground mining is at the core of rapidly evolving metals and minerals sector due to the increasi...
Ore beneficiation at a mine could be described as complex and expensive, involving many balancing pr...
Current mine production planning, scheduling, and allocation of resources are based on mathematical ...
MIng (Mechanical Engineering), Potchefstroom University for Christian Higher Education, 2003The focu...
This paper proposes a new multi-resource multi-stage mine production timetabling problem for optimis...
This paper proposes a new multi-resource multi-stage scheduling problem for optimising the open-pit ...
This paper proposes a new multi-stage mine production timetabling (MMPT) model to optimise open-pit ...
In the literature of mining optimisation, most classical mine block sequencing or open-pit mine prod...
Mixed integer programming (MIP) has been used for optimizing production schedules of mines since the...
Mining is a complex, expensive, yet lucrative business. Today's open-pit mines are huge projects in ...
Open-pit mining is an operation in which blocks from the ground are dug to extract the ore contained...
A multi-resource multi-stage scheduling methodology is developed to solve short-term open-pit mine p...
The extraction of ore from a mine must be scheduled to meet specific order production targets or `bu...
The open pit mine production scheduling problem (OPMPSP) is a well-known combinatorial optimization ...
This paper summarizes a research to develop an optimization algorithm used to support short term pla...
Underground mining is at the core of rapidly evolving metals and minerals sector due to the increasi...
Ore beneficiation at a mine could be described as complex and expensive, involving many balancing pr...
Current mine production planning, scheduling, and allocation of resources are based on mathematical ...
MIng (Mechanical Engineering), Potchefstroom University for Christian Higher Education, 2003The focu...