Resource assignment and scheduling is a difficult task when job processing times are stochastic, and resources are to be used for both known and unknown demand. To operate effectively within such an environment, several novel strategies are investigated. The first focuses upon the creation of a robust schedule, and utilises the concept of strategically placed idle time (i.e. buffering). The second approach introduces the idea of maintaining a number of free resources at each time, and culminates in another form of strategically placed buffering. The attraction of these approaches is that they are easy to grasp conceptually, and mimic what practitioners already do in practice. Our extensive numerical testing has shown that these techniques e...
International audienceOvercrowding in emergency departments (ED) is manifest through excessive patie...
Traditional job shop scheduling models ignore the stochastic elements that exist in actual job shops...
Quite often transportation companies face two types of jobs, ones which they can plan themselves and...
Project managers are faced with the challenging task of managing an environment filled with uncertai...
International audienceIn this paper, we are interested in scheduling and checkpointing stochastic jo...
The area of focus for this research is the Stochastic Resource Constrained Project Scheduling Proble...
Solution-robust project scheduling is a growing research field aiming at constructing proactive sche...
An unmistakable trend in embedded systems is the growth of soft real-time computing. A soft real-ti...
Solution robust project scheduling is a growing research field aiming at constructing proactive sche...
The resource-constrained project scheduling problem (RCPSP) has been the subject of a great deal of ...
A scheduling problem is formulated in order to consistently manage each manufacturing resource, incl...
Abstract. Standard job scheduling uses static job sizes which lacks flexibility regarding changing l...
In practice, machine schedules are usually subject to disruptions which have to be repaired by react...
We consider a scheduling problem where the firm must compete with other firms to win future jobs. Un...
When uncertainties come into play, the leveled baseline schedule obtained by solving the determinist...
International audienceOvercrowding in emergency departments (ED) is manifest through excessive patie...
Traditional job shop scheduling models ignore the stochastic elements that exist in actual job shops...
Quite often transportation companies face two types of jobs, ones which they can plan themselves and...
Project managers are faced with the challenging task of managing an environment filled with uncertai...
International audienceIn this paper, we are interested in scheduling and checkpointing stochastic jo...
The area of focus for this research is the Stochastic Resource Constrained Project Scheduling Proble...
Solution-robust project scheduling is a growing research field aiming at constructing proactive sche...
An unmistakable trend in embedded systems is the growth of soft real-time computing. A soft real-ti...
Solution robust project scheduling is a growing research field aiming at constructing proactive sche...
The resource-constrained project scheduling problem (RCPSP) has been the subject of a great deal of ...
A scheduling problem is formulated in order to consistently manage each manufacturing resource, incl...
Abstract. Standard job scheduling uses static job sizes which lacks flexibility regarding changing l...
In practice, machine schedules are usually subject to disruptions which have to be repaired by react...
We consider a scheduling problem where the firm must compete with other firms to win future jobs. Un...
When uncertainties come into play, the leveled baseline schedule obtained by solving the determinist...
International audienceOvercrowding in emergency departments (ED) is manifest through excessive patie...
Traditional job shop scheduling models ignore the stochastic elements that exist in actual job shops...
Quite often transportation companies face two types of jobs, ones which they can plan themselves and...