Planning a project in any industry is one of the most import steps of the process. In the construction industry, the quality of work completed during the preconstruction phase of a project can be the difference between a successful and unsuccessful project. No one step is more important than the other. This paper outlines the process of designing an outdoor pergola with a permeable paver system as well as providing pre-construction services. First, the design of the structure was created in collaboration with a local non-profit to ensure both feasibility and desirability for both parties. Next, a quantity take-off was performed which essential for developing a better understanding of the project. It is also necessary to create an accurate b...