The failure of cost anticipation and allocation in construction is attributable to ignorance of the nature and values of elemental direct costs in developing countries. This study aims at providing bases for precise and simplified prediction and management of direct costs of structural building elements for labour-only contracts. The objectives of the study are to identify quantitative variables influencing direct costs of structural building elements and develop cost prediction models for small and medium rise buildings. A total of 216 low and medium rise building projects were used for analyses. Data were obtained from cost records and published data. Tools used for data analyses were descriptive and standard regression analyses. T...
In-complete project definition at schematic design phase create difficulty in obtaining tangible cos...
The study assessed the effects of time and non-time related cost factors on final cost of constructi...
Abstract: One of the foremost challenges faced by the construction industry is the issue of cost ove...
The failure of cost anticipation and allocation in construction is attributable to ignorance of the ...
The difficulty in accurately forecasting costs of building projects is traceable to inability to det...
Major problem in Nigeria construction industry is that building contracts are completed at sums muc...
Inaccurate costs forecast of building projects is traceable to variation in direct and indirect cost...
Estimation of cost for building and civil engineering projects with minimum error at the conceptual ...
A number of research studies have been carried out on the causes and effects of variation on constru...
A number of research studies have been carried out on the causes and effects of variation on constru...
Maintaining steady cost projection on construction projects had been until recently an issue of seri...
Cost of building a house is high and principally depends on cost of labour and materials. But over t...
The models structure of construction cost and price forecasting underlie all the techniques being us...
Residential building accommodation projects undertaken by individuals and organizations are investme...
This paper investigates the adequacy of some nontraditional approaches to produce realistic forecast...
In-complete project definition at schematic design phase create difficulty in obtaining tangible cos...
The study assessed the effects of time and non-time related cost factors on final cost of constructi...
Abstract: One of the foremost challenges faced by the construction industry is the issue of cost ove...
The failure of cost anticipation and allocation in construction is attributable to ignorance of the ...
The difficulty in accurately forecasting costs of building projects is traceable to inability to det...
Major problem in Nigeria construction industry is that building contracts are completed at sums muc...
Inaccurate costs forecast of building projects is traceable to variation in direct and indirect cost...
Estimation of cost for building and civil engineering projects with minimum error at the conceptual ...
A number of research studies have been carried out on the causes and effects of variation on constru...
A number of research studies have been carried out on the causes and effects of variation on constru...
Maintaining steady cost projection on construction projects had been until recently an issue of seri...
Cost of building a house is high and principally depends on cost of labour and materials. But over t...
The models structure of construction cost and price forecasting underlie all the techniques being us...
Residential building accommodation projects undertaken by individuals and organizations are investme...
This paper investigates the adequacy of some nontraditional approaches to produce realistic forecast...
In-complete project definition at schematic design phase create difficulty in obtaining tangible cos...
The study assessed the effects of time and non-time related cost factors on final cost of constructi...
Abstract: One of the foremost challenges faced by the construction industry is the issue of cost ove...