Despite the fact that integration of supply chains within a construction project is preferred, we see that an integrated approach of various construction projects in the Netherlands is hampered due to diverse reasons. These projects are often multidisciplinary projects and are deliberately divided into multiple subprojects. Between these subprojects a phenomenon appears called interfaces. Most of the time these interfaces are inherent to characteristic risks where, up to present, a thorough academic research and a pragmatic approach to these interface risks is lacking. The reasons why projects are divided are diverse and up to present not clear. Besides that, it appears that there is a lack of an unambiguous understanding of the relation be...
The object of research is the risk of tearing of integration ties between the participants arising i...
Geo-Impuls is a Dutch nationwide programme with the aim to reduce geotechnical related failures in p...
Risks have a significant impact on a construction project’s performance in terms of cost, time and q...
As a high hazard industry, it is important to pay high attention to the health and safety of the wor...
The construction industry has been, throughout time, heavily hindered by cost overruns and delays in...
Cooperation figured prominently in the Dutch construction industry’s agenda over the past years. In ...
Despite continuous efforts to improve, the construction industry is prone to failure of large infras...
Abstract: Normally, the owner must contract with construction contractors and core system contractor...
The supply chains of complex construction projects are characterized by multi-disciplinary participa...
Construction projects are argued to be the most complex of all production undertakings (Baccarini, 1...
In the construction industry, there are various methods for how the client and contractor should wor...
Extensive and increasing specialization in construction has prompted much criticism-that fragmentati...
In the construction industry, disputes tend to arise frequently between contractors and clients. Thi...
Any industry is focusing on creating an environment that is as safe as possible for everyone that is...
Traditional contracting has been largely shown to cause adversarial relationships between client and...
The object of research is the risk of tearing of integration ties between the participants arising i...
Geo-Impuls is a Dutch nationwide programme with the aim to reduce geotechnical related failures in p...
Risks have a significant impact on a construction project’s performance in terms of cost, time and q...
As a high hazard industry, it is important to pay high attention to the health and safety of the wor...
The construction industry has been, throughout time, heavily hindered by cost overruns and delays in...
Cooperation figured prominently in the Dutch construction industry’s agenda over the past years. In ...
Despite continuous efforts to improve, the construction industry is prone to failure of large infras...
Abstract: Normally, the owner must contract with construction contractors and core system contractor...
The supply chains of complex construction projects are characterized by multi-disciplinary participa...
Construction projects are argued to be the most complex of all production undertakings (Baccarini, 1...
In the construction industry, there are various methods for how the client and contractor should wor...
Extensive and increasing specialization in construction has prompted much criticism-that fragmentati...
In the construction industry, disputes tend to arise frequently between contractors and clients. Thi...
Any industry is focusing on creating an environment that is as safe as possible for everyone that is...
Traditional contracting has been largely shown to cause adversarial relationships between client and...
The object of research is the risk of tearing of integration ties between the participants arising i...
Geo-Impuls is a Dutch nationwide programme with the aim to reduce geotechnical related failures in p...
Risks have a significant impact on a construction project’s performance in terms of cost, time and q...