In the 2014 finalised timetable for Sweden 314 operation days had a unique set of trains i.e. a unique traffic pattern. Despite this, the finalised timetable generally provides only one conflict resolved train path for each train, and this train path is to be used for all of the train’s operation days. Further, once the yearly timetable has been finalised train paths may not be changed, causing great inflexibility in later planning stages. Rather than finalizing entire train paths only certain characteristics of a train path, called delivery commitments, could be finalised. This allows for more flexibility in later planning stages. Delivery commitments could e.g. be arrival and departure times at important locations or the total running...
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
The aim of this paper is to analyze and to improve the current planning process of the passenger rai...
The timetable planning process in Sweden today can be considered as an annual process. The process d...
In the 2014 finalised timetable for Sweden 314 operation days had a unique set of trains i.e. a uniq...
Measuring timetable robustness is a complex task. Previous efforts have mainly been focused on simul...
Due to high demand and capacity consumption, railway timetables are often sensitive to disturbances....
Timetables are important for train punctuality. However, relatively little attention has been paid t...
no isbnWith our Periodic Event Scheduling Problem (PESP) based timetabling method we are able to pro...
Fr8Rail II/Work-Package 3 Real-time network management and improved methods for timetable planning a...
A railway timetable is typically planned one year in advance, but may be revised several times prior...
This paper describes research in modelling train timetable and route generation as a constraint-sati...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure main...
Today, detailed railway timetables in Sweden are published up to a year in advance, despite being ba...
No country uses optimisation methods to establish a value maximising allocation of operators’ demand...
We identify the on-time performance as a key to evaluate a railway timetable’s robustness to disturb...
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
The aim of this paper is to analyze and to improve the current planning process of the passenger rai...
The timetable planning process in Sweden today can be considered as an annual process. The process d...
In the 2014 finalised timetable for Sweden 314 operation days had a unique set of trains i.e. a uniq...
Measuring timetable robustness is a complex task. Previous efforts have mainly been focused on simul...
Due to high demand and capacity consumption, railway timetables are often sensitive to disturbances....
Timetables are important for train punctuality. However, relatively little attention has been paid t...
no isbnWith our Periodic Event Scheduling Problem (PESP) based timetabling method we are able to pro...
Fr8Rail II/Work-Package 3 Real-time network management and improved methods for timetable planning a...
A railway timetable is typically planned one year in advance, but may be revised several times prior...
This paper describes research in modelling train timetable and route generation as a constraint-sati...
Increasing supply in railway networks comes at the cost of an increased need for infrastructure main...
Today, detailed railway timetables in Sweden are published up to a year in advance, despite being ba...
No country uses optimisation methods to establish a value maximising allocation of operators’ demand...
We identify the on-time performance as a key to evaluate a railway timetable’s robustness to disturb...
Performance aspects such as travel time, punctuality and robustness are conflicting goals of utmost ...
The aim of this paper is to analyze and to improve the current planning process of the passenger rai...
The timetable planning process in Sweden today can be considered as an annual process. The process d...