The Problem of Automatic Generation Control of large interconnected multi-area system is necessitated by the importance of maintenance of frequency and tie-line flows at their scheduled values. Disturbance in any part of the power system network has its effect on the frequency and tie-line power flows of the entire network. Thus, It is the responsibility of the Power system engineers to ensure that adequate power is delivered to the load reliably and economically so that nominal condition will be re-established. This Research paper aims to represents how nominal value can be achieved by close loop control of real and reactive powers generated in the controllable source of the system with the help of conventional controllers.DOI:http://dx.do...
In power system, as any inequality between production and consumption results in an instantaneous ch...
This paper presents a MATLAB simulator of a three area interconnected power system of Thermal-Gas-Hy...
Abstract: For interconnection of two or more areas in power system, frequency should be maintained w...
This paper deals with the applications of automatic generation control (AGC) of a hydro —thermal and...
The present article is aimed to discuss the various operational and control aspects of interconnecte...
This paper deals with the applications of automatic generation control (AGC) of a hydro — thermal an...
Copyright © 2013 ISSR Journals. This is an open access article distributed under the Creative Common...
Automatic generation control (AGC) is major issue in power system whose main purpose is to maintain ...
Abstract: Load frequency control or automatic generation control is one of the main operations that ...
Variations in power system load causes deviations in system frequency and can be reduced by Automati...
Load frequency Control (LFC) is used for many years as part of Automatic Generation Control (AGC) in...
Many development republics began to get rid of conventional energy and towards to use renewable ener...
Load-frequency control (LFC) is a part of the Automatic Generation Control (AGC) in power systems, t...
This paper presents the analysis of Automatic generation control (AGC) of a two-area hydrothermal sy...
In restructured power system, engineering aspects of planning and operation have to be reformulated ...
In power system, as any inequality between production and consumption results in an instantaneous ch...
This paper presents a MATLAB simulator of a three area interconnected power system of Thermal-Gas-Hy...
Abstract: For interconnection of two or more areas in power system, frequency should be maintained w...
This paper deals with the applications of automatic generation control (AGC) of a hydro —thermal and...
The present article is aimed to discuss the various operational and control aspects of interconnecte...
This paper deals with the applications of automatic generation control (AGC) of a hydro — thermal an...
Copyright © 2013 ISSR Journals. This is an open access article distributed under the Creative Common...
Automatic generation control (AGC) is major issue in power system whose main purpose is to maintain ...
Abstract: Load frequency control or automatic generation control is one of the main operations that ...
Variations in power system load causes deviations in system frequency and can be reduced by Automati...
Load frequency Control (LFC) is used for many years as part of Automatic Generation Control (AGC) in...
Many development republics began to get rid of conventional energy and towards to use renewable ener...
Load-frequency control (LFC) is a part of the Automatic Generation Control (AGC) in power systems, t...
This paper presents the analysis of Automatic generation control (AGC) of a two-area hydrothermal sy...
In restructured power system, engineering aspects of planning and operation have to be reformulated ...
In power system, as any inequality between production and consumption results in an instantaneous ch...
This paper presents a MATLAB simulator of a three area interconnected power system of Thermal-Gas-Hy...
Abstract: For interconnection of two or more areas in power system, frequency should be maintained w...