More than twenty-five thousand hybrids will be produced for the CMS Outer Tracker Phase-2 Upgrade. The hybrids are assembled with flip-chips, passives and carbon-fibre stiffeners. They will be glued to their module supports, together with powering and optical transmission hybrids, making repairs almost impossible. Due to the complexity of the hybrid circuits and the circuit assembly, production scale testing is a very important aspect. A crate-based scalable test system was designed to enable a multiplexed test of front-end hybrids. A test card was produced for the 2S hybrids and two different hybrid test cards are under development
First full size 2S module prototypes for the CMS Phase-2 Outer Tracker Upgrade have been assembled. ...
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactio...
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactio...
Up to fifty thousand front-end and service hybrids are required for the CMS Outer Tracker Phase-2 Up...
The Phase-2 Upgrade of the CMS Outer Tracker requires the production of 7608 Strip-Strip (2S) and 55...
The upgrade of the CMS Outer Tracker for the HL-LHC requires the design of new double-sensor modules...
New high-density interconnect hybrid circuits are under development for the CMS tracker modules at t...
High Density Interconnect (HDI) hybrids are being developed for the CMS Tracker Phase Two Upgrade fo...
The upgrade of the CMS tracker for the HL-LHC is based on a binary readout scheme using the CMS Bina...
The CMS Outer Tracker planned for the HL-LHC Upgrade contains strip-strip and pixel-strip silicon mo...
High Density Interconnect hybrids are being developed for the CMS tracker Phase-2 upgrade for the HL...
The innermost region of the CMS detector will consist of silicon pixel and silicon microstrip detect...
The CMS tracker upgrade for the HL-LHC relies on different module types, depending on the position o...
The upgrade of the CMS tracker at the HL-LHC requires the design of new front-end modules to cope wi...
International audienceThe Compact Muon Solenoid (CMS) experiment plans to replace its strip tracker ...
First full size 2S module prototypes for the CMS Phase-2 Outer Tracker Upgrade have been assembled. ...
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactio...
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactio...
Up to fifty thousand front-end and service hybrids are required for the CMS Outer Tracker Phase-2 Up...
The Phase-2 Upgrade of the CMS Outer Tracker requires the production of 7608 Strip-Strip (2S) and 55...
The upgrade of the CMS Outer Tracker for the HL-LHC requires the design of new double-sensor modules...
New high-density interconnect hybrid circuits are under development for the CMS tracker modules at t...
High Density Interconnect (HDI) hybrids are being developed for the CMS Tracker Phase Two Upgrade fo...
The upgrade of the CMS tracker for the HL-LHC is based on a binary readout scheme using the CMS Bina...
The CMS Outer Tracker planned for the HL-LHC Upgrade contains strip-strip and pixel-strip silicon mo...
High Density Interconnect hybrids are being developed for the CMS tracker Phase-2 upgrade for the HL...
The innermost region of the CMS detector will consist of silicon pixel and silicon microstrip detect...
The CMS tracker upgrade for the HL-LHC relies on different module types, depending on the position o...
The upgrade of the CMS tracker at the HL-LHC requires the design of new front-end modules to cope wi...
International audienceThe Compact Muon Solenoid (CMS) experiment plans to replace its strip tracker ...
First full size 2S module prototypes for the CMS Phase-2 Outer Tracker Upgrade have been assembled. ...
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactio...
At the High Luminosity LHC (HL-LHC), the CMS experiment will need to operate at up to 200 interactio...