Concrete girder bridges are a commonly used type of bridge which can be reinforced withboth regular and post-tensioned reinforcement. At a certain span length, the use of tensionreinforcement becomes a must because regular reinforcement won’t be enough. To get anidea of where this boundary lies, we studied a bridge in this research which is a half-throughbridge intended for railway traffic with the use of post-tensioned reinforcements. Thisbridge has a span of 22,15 metres and it is compared to bridges at the same span andshorter span using regular reinforcements. The analysis in this thesis is made using the finiteelementsprogram Brigade Standard.Two previously executed projects are used as references. A literature study will be carriedout...