Research Question: can a BIM-based workflow information system help construction personnel implement lean pull flow strategies? If so, how, and to what extent? Purpose: to test a prototype system in the field, measure and monitor its impact, and evaluate and discuss the implications. Research Method: we have implemented an early prototype of a novel workflow management information system for construction, called ‘KanBIM’, and tested it on a large residential construction site in three stages. Findings: the main significance of the results lies in the site personnel’s positive experience with the system and their observations of the ways in which it could influence the behavior and productivity of crews. These included recognition of the eff...
Research Question: How do different flow dimensions and their interrelations appear in Swedish const...
Research Question/Hypothesis: Value Stream Mapping (VSM) can, independent of work repetition, improv...
The construction sector suffers from flat or sometimes even falling productivity rates while it is o...
The KanBIM™ system is designed to support lean work flow control on construction sites. It facilitat...
Purpose: The study aims to test, measure and quantify the impacts of lean construction and BIM imple...
Smooth flow of production in construction is hampered by disparity between individual trade teams' g...
Purpose: For the last 20 years the construction industry has increased their productivity with appro...
Question: How can the learning of design management operations in a construction company be accelera...
Question: What are the benefits of using the Last Planner System in commercial construction projects...
The AEC-industry has been lagging behind other types of production industries in terms of productivi...
Abstract: Process control is an essential base for the efficient and successful execution of constru...
Globally, the construction sector suffers from low productivity levels due to a large proportion of ...
Implementation of advanced production management techniques, such as lean construction concepts like...
Work flow and productivity in construction project production systems can be improved through though...
peer reviewedThe main objective of this paper is to evaluate the potential role of approaches that i...
Research Question: How do different flow dimensions and their interrelations appear in Swedish const...
Research Question/Hypothesis: Value Stream Mapping (VSM) can, independent of work repetition, improv...
The construction sector suffers from flat or sometimes even falling productivity rates while it is o...
The KanBIM™ system is designed to support lean work flow control on construction sites. It facilitat...
Purpose: The study aims to test, measure and quantify the impacts of lean construction and BIM imple...
Smooth flow of production in construction is hampered by disparity between individual trade teams' g...
Purpose: For the last 20 years the construction industry has increased their productivity with appro...
Question: How can the learning of design management operations in a construction company be accelera...
Question: What are the benefits of using the Last Planner System in commercial construction projects...
The AEC-industry has been lagging behind other types of production industries in terms of productivi...
Abstract: Process control is an essential base for the efficient and successful execution of constru...
Globally, the construction sector suffers from low productivity levels due to a large proportion of ...
Implementation of advanced production management techniques, such as lean construction concepts like...
Work flow and productivity in construction project production systems can be improved through though...
peer reviewedThe main objective of this paper is to evaluate the potential role of approaches that i...
Research Question: How do different flow dimensions and their interrelations appear in Swedish const...
Research Question/Hypothesis: Value Stream Mapping (VSM) can, independent of work repetition, improv...
The construction sector suffers from flat or sometimes even falling productivity rates while it is o...