Following a tunnel excavation in low-permeability soil, it is commonly observed that the ground surface continues to settle and ground loading on the tunnel lining changes, as the pore pressures in the ground approach a new equilibrium condition. The monitored ground response following the tunnelling under St James's Park, London, shows that the mechanism of subsurface deformation is composed of three different zones: swelling, consolidation and rigid body movement. The swelling took place in a confined zone above the tunnel crown, extending vertically to approximately 5 m above it. On the sides of the tunnel, the consolidation of the soil occurred in the zone primarily within the tunnel horizon, from the shoulder to just beneath the invert...
Subsurface ground displacements from the construction of the twin-bore Crossrail tunnels in London C...
This thesis discusses the interaction between methods of tunnelling in soil and sources of ground lo...
Earth-pressure-balance machines (EPBMs) were used for the construction of Crossrail tunnels in Londo...
The use of a kinematic hardening soil model for predicting short- and long-term ground movements due...
The twin-tunnel construction of the Jubilee Line Extension tunnels beneath St James's Park was simul...
Ground response to the construction of the Crossrail tunnels in London Clay beneath Hyde Park has be...
The assessment of ageing tunnels requires a deeper understanding of the long-term behaviour of twin ...
Site S3 of the King’s Cross Development Zone is located in Central London to the North of King’s Cro...
Thesis: Ph. D., Massachusetts Institute of Technology, Department of Civil and Environmental Enginee...
Numerical modelling has been used for a number of years for problems relating to soft-ground tunnell...
A series of centrifuge model tests in clay was carried out to investigate the response of an existin...
International audienceIncreasing tunnel excavations in dense urban areas faces the issue of accurate...
Thesis: Ph. D., Massachusetts Institute of Technology, Department of Civil and Environmental Enginee...
Tunnels under large metropolitan cities have been constructed for almost two centuries. As the citie...
The increasing demand for public transport provision in cities has resulted in a requirement for enl...
Subsurface ground displacements from the construction of the twin-bore Crossrail tunnels in London C...
This thesis discusses the interaction between methods of tunnelling in soil and sources of ground lo...
Earth-pressure-balance machines (EPBMs) were used for the construction of Crossrail tunnels in Londo...
The use of a kinematic hardening soil model for predicting short- and long-term ground movements due...
The twin-tunnel construction of the Jubilee Line Extension tunnels beneath St James's Park was simul...
Ground response to the construction of the Crossrail tunnels in London Clay beneath Hyde Park has be...
The assessment of ageing tunnels requires a deeper understanding of the long-term behaviour of twin ...
Site S3 of the King’s Cross Development Zone is located in Central London to the North of King’s Cro...
Thesis: Ph. D., Massachusetts Institute of Technology, Department of Civil and Environmental Enginee...
Numerical modelling has been used for a number of years for problems relating to soft-ground tunnell...
A series of centrifuge model tests in clay was carried out to investigate the response of an existin...
International audienceIncreasing tunnel excavations in dense urban areas faces the issue of accurate...
Thesis: Ph. D., Massachusetts Institute of Technology, Department of Civil and Environmental Enginee...
Tunnels under large metropolitan cities have been constructed for almost two centuries. As the citie...
The increasing demand for public transport provision in cities has resulted in a requirement for enl...
Subsurface ground displacements from the construction of the twin-bore Crossrail tunnels in London C...
This thesis discusses the interaction between methods of tunnelling in soil and sources of ground lo...
Earth-pressure-balance machines (EPBMs) were used for the construction of Crossrail tunnels in Londo...