The influence of ground clearance on the flow around a simplified high-speed train is investigated in this paper. Four clearance heights are studied using IDDES. After a grid independence study, the results of the simulations are validated against experimental data present in the literature. It is found that the drag decreases when reducing the clearance gap from the baseline height to a possibly critical height, while drag remains constant when the clearance is lower than this critical height. The negative lift (downforce) increases with the decreasing of the clearance gap. The flow is particularly influenced by the gap height at the underbody and wake regions, where a lower underbody velocity and a higher wake velocity are observed with l...
The need for interoperability for rail operators across Europe has led to the development of the Tec...
Numerical studies on race car aerodynamics at wing in ground effect have been carried out using a st...
This thesis work was performed during Aug. 2006 – Feb. 2007 at Bombardier Transportation in Västerå...
The effect of lowering the ground clearance, on train aerodynamics is investigated using IDDES. The ...
Wind tunnel testing is commonly used to assess and optimize the aerodynamic characteristics of high-...
Related to the train underfloor carbody aerodynamics, a phenomenon of ballast flight occurs frequent...
This study investigates the effects of bogie cavities and bogies on the aerodynamic behaviour of a h...
\ua9 2019 Elsevier Ltd In this study, the numerical solution of a high-speed train with several simp...
In this study, an improved delayed detached-eddy simulation method has been used to investigate the ...
Inspired by the fact that bogies and bottom equipment generally contribute a great deal of aerodynam...
The introduction of dedicated high-speed railway lines around the world has led to issues associated...
The aerodynamic drag of a high-speed train can contribute significantly to its energy consumption. H...
In this study, an improved delayed detached eddy simulation (IDDES) method based on shear-stress tra...
As the running speed of high-speed trains increases, aerodynamic drag becomes the key factor which l...
A numerical study using improved delayed detached eddy simulation (IDDES) was used to investigate th...
The need for interoperability for rail operators across Europe has led to the development of the Tec...
Numerical studies on race car aerodynamics at wing in ground effect have been carried out using a st...
This thesis work was performed during Aug. 2006 – Feb. 2007 at Bombardier Transportation in Västerå...
The effect of lowering the ground clearance, on train aerodynamics is investigated using IDDES. The ...
Wind tunnel testing is commonly used to assess and optimize the aerodynamic characteristics of high-...
Related to the train underfloor carbody aerodynamics, a phenomenon of ballast flight occurs frequent...
This study investigates the effects of bogie cavities and bogies on the aerodynamic behaviour of a h...
\ua9 2019 Elsevier Ltd In this study, the numerical solution of a high-speed train with several simp...
In this study, an improved delayed detached-eddy simulation method has been used to investigate the ...
Inspired by the fact that bogies and bottom equipment generally contribute a great deal of aerodynam...
The introduction of dedicated high-speed railway lines around the world has led to issues associated...
The aerodynamic drag of a high-speed train can contribute significantly to its energy consumption. H...
In this study, an improved delayed detached eddy simulation (IDDES) method based on shear-stress tra...
As the running speed of high-speed trains increases, aerodynamic drag becomes the key factor which l...
A numerical study using improved delayed detached eddy simulation (IDDES) was used to investigate th...
The need for interoperability for rail operators across Europe has led to the development of the Tec...
Numerical studies on race car aerodynamics at wing in ground effect have been carried out using a st...
This thesis work was performed during Aug. 2006 – Feb. 2007 at Bombardier Transportation in Västerå...