This paper presents a probabilistic approach for optimizing stope design methodology whiletaking into consideration the variability in the rock mass properties. For this study, a complex orebody in aCanadian mine was used. Because of the variability in the rock mass properties of the orebody, it was notpossible to determine precisely, the values of geotechnical design input parameters and hence the need toutilize a probabilistic approach. Point Estimate Method (PEM), a probabilistic tool, was incorporated intonumerical analysis using FLAC3D to study the deformation magnitudes of various stope geometries todetermine the optimal stope geometry with a minimum ground control problem. Results obtained for thedistribution of the wall deformations...
Numerical modeling techniques have been applied in many mining and civil engineering projects. Tradi...
Uncertainty is intrinsic to mine design and planning and introduces risk into the process. Nonethele...
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especi...
This paper presents a probabilistic approach for modelling complex rock masses wherethe intrinsic pr...
The rock mass is intrinsically variable in its physical and mechanical properties which makes it com...
Strip mining with subsequent filling is one of the main mining methods for gently inclined thin ore ...
Stress-induced failure is among the most common causes of instability in Canadian deep underground m...
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploite...
Mine design and mine planning are essential to a mining operation as they do not only dictate the ou...
Empirical design methods are commonly used for rock mechanics evaluations. An appropriate method of...
The stoping performance has a paramount effect on the economic viability of underground mining opera...
The optimal layout or geometry of the production area (stope) in an underground mining operation max...
Stope performance is critical and is therefore usually assessed in mine operations. However, the fac...
In the mining industry there are several methods to predict how the rock mass will behave. One of th...
An optimal layout or three-dimensional spatial distribution of stopes guarantees the maximum profita...
Numerical modeling techniques have been applied in many mining and civil engineering projects. Tradi...
Uncertainty is intrinsic to mine design and planning and introduces risk into the process. Nonethele...
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especi...
This paper presents a probabilistic approach for modelling complex rock masses wherethe intrinsic pr...
The rock mass is intrinsically variable in its physical and mechanical properties which makes it com...
Strip mining with subsequent filling is one of the main mining methods for gently inclined thin ore ...
Stress-induced failure is among the most common causes of instability in Canadian deep underground m...
Deeper deposits become the future of mining as an increasing amount of shallow deposits are exploite...
Mine design and mine planning are essential to a mining operation as they do not only dictate the ou...
Empirical design methods are commonly used for rock mechanics evaluations. An appropriate method of...
The stoping performance has a paramount effect on the economic viability of underground mining opera...
The optimal layout or geometry of the production area (stope) in an underground mining operation max...
Stope performance is critical and is therefore usually assessed in mine operations. However, the fac...
In the mining industry there are several methods to predict how the rock mass will behave. One of th...
An optimal layout or three-dimensional spatial distribution of stopes guarantees the maximum profita...
Numerical modeling techniques have been applied in many mining and civil engineering projects. Tradi...
Uncertainty is intrinsic to mine design and planning and introduces risk into the process. Nonethele...
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especi...