Abstract: Priest Rapids Dam is a large (955 MW) hydroelectric dam on the Columbia River in Washington State, USA. As part of regulatory requirements associated with its FERC (Federal Energy Regulatory Commission) license and other agreements, the Public Utility District No. 2 of Grant County, WA was required to design and install non-turbine fish passage for downstream migrating juvenile salmonids at the dam, for the purpose to help meet its pre-establish survival standards for salmonid smolts passing through the Priest Rapids Hydroelectric Project during their downstream migration. This presentation is a case study highlighting the numerous steps that went into the design of that nonturbine fish passage facility which started with a surfac...
Run-of-river hydroelectric projects do not have many of the environmental issues associated with lar...
Completion of the Cowlitz River Project in the 1960s effectively blocked historical Cowlitz River ru...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
In 2004, following consultations with the Federal Energy Regulatory Commission (FERC), the National ...
Columbia River hydropower is an economic mainstay of the Pacific Northwest. However, it is well know...
Abstract: The River Mill Dam Hydroelectric Development is part of the Clackamas River Hydroelectric ...
Abstract: In the Pacific Northwest, downstream migration of juvenile salmon on the Columbia River ha...
This paper describes a number of years of physical and numerical modelling that were instrumental in...
Abstract: When Cle Elum Dam (Washington, USA) was constructed, a highly productive sockeye salmon fi...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
Like large hydropower counterparts in the Columbia River, low-elevation dams and irrigation diversio...
Tacoma Power The Cowlitz River hosts numerous fish species including coho and Chinook salmon, steelh...
Throughout the Pacific Northwest region there is a renewed effort to provide upstream and downstream...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
Run-of-river hydroelectric projects do not have many of the environmental issues associated with lar...
Completion of the Cowlitz River Project in the 1960s effectively blocked historical Cowlitz River ru...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...
In 2004, following consultations with the Federal Energy Regulatory Commission (FERC), the National ...
Columbia River hydropower is an economic mainstay of the Pacific Northwest. However, it is well know...
Abstract: The River Mill Dam Hydroelectric Development is part of the Clackamas River Hydroelectric ...
Abstract: In the Pacific Northwest, downstream migration of juvenile salmon on the Columbia River ha...
This paper describes a number of years of physical and numerical modelling that were instrumental in...
Abstract: When Cle Elum Dam (Washington, USA) was constructed, a highly productive sockeye salmon fi...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
Like large hydropower counterparts in the Columbia River, low-elevation dams and irrigation diversio...
Tacoma Power The Cowlitz River hosts numerous fish species including coho and Chinook salmon, steelh...
Throughout the Pacific Northwest region there is a renewed effort to provide upstream and downstream...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
Many anadromous fish species, such as Pacific and Atlantic salmon (Onchorhynchus spp., Salmo salar),...
Run-of-river hydroelectric projects do not have many of the environmental issues associated with lar...
Completion of the Cowlitz River Project in the 1960s effectively blocked historical Cowlitz River ru...
Construction of the Pelton Round Butte Hydroelectric Project (rkm 100) in the 1960s, denied anadromo...