Thesis (Doctoral)--İzmir Institute of Technology, Architecture, İzmir, 2005Includes bibliographical references (leaves:111)Text in English; Abstract: Turkish and Englishx, 111 leavesIt is desirable to predict construction costs in the early design stages in order tomake sure that target costs are met and competitive prices are realized. This study investigates the possibility of predicting the cost of construction early in the design phase by using machine learning (ML) techniques. To achieve this objective, artificialneural network (ANN) and case based reasoning (CBR) prediction models were developed in a spreadsheet-based format. An investigation of the impacts of weight generation methods on the ANN and CBR models was conducted. The pe...
The capability of various machine learning techniques in predicting construction project profit in r...
Pre-tender estimates are susceptible to inaccuracies (biases) because they are often prepared within...
The aim of this study is to develop a Cost Expectancy Limit Model that could assist clients in havin...
Reasonably accurate cost estimation of the structural system is quite desirable at the early stages ...
The importance of decision making in cost estimation for building design processes points to a need ...
The motive of this study is to apply Artificial neural network (ANN) for pre design cost estimation ...
This paper compares the performance of three different decision-tree-based methods of assigning attr...
Building Informatics is a body of knowledge that uses the ICT computer system, digital systems, buil...
The last half-century has witnessed an astronomical rise in the number of tall building projects in ...
The aim of this study is to develop a system that could be described as Cost Expectancy Limit Model ...
Cost is one of the major factors in decision making at the early stages of a building construction p...
In this paper, for forecasting costs of multiplet reinforced concrete residentialbuildings, which ha...
Decision making at the early stages of a construction project has a significant impact on the projec...
The case-based reasoning (CBR) method can be an effective means of utilizing knowledge gained from p...
SUMMARY: This paper presents a study on the use of artificial neural networks (ANNs) in preliminary ...
The capability of various machine learning techniques in predicting construction project profit in r...
Pre-tender estimates are susceptible to inaccuracies (biases) because they are often prepared within...
The aim of this study is to develop a Cost Expectancy Limit Model that could assist clients in havin...
Reasonably accurate cost estimation of the structural system is quite desirable at the early stages ...
The importance of decision making in cost estimation for building design processes points to a need ...
The motive of this study is to apply Artificial neural network (ANN) for pre design cost estimation ...
This paper compares the performance of three different decision-tree-based methods of assigning attr...
Building Informatics is a body of knowledge that uses the ICT computer system, digital systems, buil...
The last half-century has witnessed an astronomical rise in the number of tall building projects in ...
The aim of this study is to develop a system that could be described as Cost Expectancy Limit Model ...
Cost is one of the major factors in decision making at the early stages of a building construction p...
In this paper, for forecasting costs of multiplet reinforced concrete residentialbuildings, which ha...
Decision making at the early stages of a construction project has a significant impact on the projec...
The case-based reasoning (CBR) method can be an effective means of utilizing knowledge gained from p...
SUMMARY: This paper presents a study on the use of artificial neural networks (ANNs) in preliminary ...
The capability of various machine learning techniques in predicting construction project profit in r...
Pre-tender estimates are susceptible to inaccuracies (biases) because they are often prepared within...
The aim of this study is to develop a Cost Expectancy Limit Model that could assist clients in havin...