Submitted to the Department of Land and Natural Resources, State of Hawaii."Thermal Power Company (Thermal), Operator for the Puna Geothermal Venture (PGV), herein submits an application for a Geothermal Exploration Permit to conduct a Controlled Source Audio Magnetotelluric (CSAMT) survey. This is an electrical resistivity-type geophysical survey which utilizes a truck-mounted generator and ground-surface transmitting wires to induce an electrical current into the ground to augment the earth's natural magnetotelluric signal. The enhanced signal is recorded at the measurement site with backpackable equipment . The survey is a transient operation with an expected duration of one month. Surface disturbance will be negligible and all field equ...
"This feasibility study investigated the following objectives in determining whether direct use of g...
Missing pagesAn electrical resistivity survey was carried out over the Kilauea shield area in Puna a...
Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geothermal Venture Proje...
OSTI ID: 882336Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geotherma...
Pursuant to Rule 12-9(a) of the Planning Commission Rules, Puna Geothermal Venture (PGV) requests th...
Transactions, Geothermal Resources Council, Volume 4"The Geothermal Resource Assessment Program of t...
Three geophysical research organizations, working together under the auspices of the Hawaii Geotherm...
"Complying with Department of Land and Natural Resources (DLNR) Administrative Rule, Title 13, Chapt...
"PGV proposes that the GRP be amended to allow PGV to develop and operate a 60 MW geothermal power p...
Geothermal energy is playing a larger role as an alternative energy source for both electricity gene...
A regional geothermal resource assessment has been conducted for the major islands in the Hawaiian c...
"The objective of this Project Application is to provide environmental and other data in a format an...
A brief description of geothermal technology and associated impacts are discussed
The preliminary phase of a geothermal resource assessment program for the State of Hawaii has been c...
Tax map key: No. 1-4-01 parcels 2, 3, 19, and 58.A memo to Maurice A. Richard, Puna Geothermal Ventu...
"This feasibility study investigated the following objectives in determining whether direct use of g...
Missing pagesAn electrical resistivity survey was carried out over the Kilauea shield area in Puna a...
Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geothermal Venture Proje...
OSTI ID: 882336Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geotherma...
Pursuant to Rule 12-9(a) of the Planning Commission Rules, Puna Geothermal Venture (PGV) requests th...
Transactions, Geothermal Resources Council, Volume 4"The Geothermal Resource Assessment Program of t...
Three geophysical research organizations, working together under the auspices of the Hawaii Geotherm...
"Complying with Department of Land and Natural Resources (DLNR) Administrative Rule, Title 13, Chapt...
"PGV proposes that the GRP be amended to allow PGV to develop and operate a 60 MW geothermal power p...
Geothermal energy is playing a larger role as an alternative energy source for both electricity gene...
A regional geothermal resource assessment has been conducted for the major islands in the Hawaiian c...
"The objective of this Project Application is to provide environmental and other data in a format an...
A brief description of geothermal technology and associated impacts are discussed
The preliminary phase of a geothermal resource assessment program for the State of Hawaii has been c...
Tax map key: No. 1-4-01 parcels 2, 3, 19, and 58.A memo to Maurice A. Richard, Puna Geothermal Ventu...
"This feasibility study investigated the following objectives in determining whether direct use of g...
Missing pagesAn electrical resistivity survey was carried out over the Kilauea shield area in Puna a...
Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geothermal Venture Proje...