[EN] The operation of an outdoor membrane photobioreactor plant which treated the effluent of an anaerobic membrane bioreactor was optimised. Biomass retention times of 4.5, 6, and 9 days were tested. At a biomass retention time of 4.5 days, maximum nitrogen recovery rate:light irradiance ratios, photosynthetic efficiencies and carbon biofixations of 51.7¿±¿14.3¿mg¿N·mol¿1, 4.4¿±¿1.6% and 0.50¿±¿0.05¿kg CO2·m3influent, respectively, were attained. Minimum membrane fouling rates were achieved when operating at the shortest biomass retention time because of the lower solid concentration and the negligible amount of cyanobacteria and protozoa. Hydraulic retention times of 3.5, 2, and 1.5 days were tested at the optimum biomass retention times ...
Urine has been considered as an ideal nutrient source for microalgae cultivation thanks to its compo...
Renewed momentum in the microalgae industry due to commercial interest in biofuels and bioproducts i...
The objective of this paper is to present the design, construction and operation (during one year) o...
Treated sewage is a promising source of nitrogen and phosphorus in microalgae biomass production for...
[EN] With the aim of assessing the potential of microalgae cultivation for water resource recovery (...
The increase in industry and population, together with the need for wastewater reuse, makes it nece...
WOS: 000464768000017In this study, the effect of sludge retention time (SRT) on biomass production a...
Given the numerous challenges faced by conventional algae culturing techniques, such as biomass wash...
This thesis investigated the effects of combined hydraulic retention time (HRT) and nitrogen/phosph...
This study aims to evaluate the performance of C. vulgaris microalgae to simultaneously recover nutr...
This study investigated the removal of nitrogen and phosphorus from the effluent of a submerged anae...
This data in brief (DIB) article is related to a Research article entitled 'Optimising an outdoor me...
Primary urban wastewater was processed using the microalga Scenedesmus sp. in an outdoor pilot-scale...
In this study, a mixed nitrogen-fixing soil cyanobacterial culture was tested to treat municipal was...
The production of Scenedesmus sp. using wastewater was validated with pilot-scale raceway photobiore...
Urine has been considered as an ideal nutrient source for microalgae cultivation thanks to its compo...
Renewed momentum in the microalgae industry due to commercial interest in biofuels and bioproducts i...
The objective of this paper is to present the design, construction and operation (during one year) o...
Treated sewage is a promising source of nitrogen and phosphorus in microalgae biomass production for...
[EN] With the aim of assessing the potential of microalgae cultivation for water resource recovery (...
The increase in industry and population, together with the need for wastewater reuse, makes it nece...
WOS: 000464768000017In this study, the effect of sludge retention time (SRT) on biomass production a...
Given the numerous challenges faced by conventional algae culturing techniques, such as biomass wash...
This thesis investigated the effects of combined hydraulic retention time (HRT) and nitrogen/phosph...
This study aims to evaluate the performance of C. vulgaris microalgae to simultaneously recover nutr...
This study investigated the removal of nitrogen and phosphorus from the effluent of a submerged anae...
This data in brief (DIB) article is related to a Research article entitled 'Optimising an outdoor me...
Primary urban wastewater was processed using the microalga Scenedesmus sp. in an outdoor pilot-scale...
In this study, a mixed nitrogen-fixing soil cyanobacterial culture was tested to treat municipal was...
The production of Scenedesmus sp. using wastewater was validated with pilot-scale raceway photobiore...
Urine has been considered as an ideal nutrient source for microalgae cultivation thanks to its compo...
Renewed momentum in the microalgae industry due to commercial interest in biofuels and bioproducts i...
The objective of this paper is to present the design, construction and operation (during one year) o...