Using the principles set forth in percolation theory and critical path analysis (CPA), this thesis presents a method for constraining parameterized values of critical pore size and a cumulative volumetric density function using the shape and scale of accessibility functions and a mercury intrusion capillary pressure (MICP) data set. Constraints can be made without an independent pore size distribution measurement. These parameters can be combined with the percolation threshold corrected for finite sample size and electrical formation factor to determine permeability and to approximate pore size distribution. The analysis uses predetermined permeability, porosity, and formation factor values in Berea Sandstone and Racine Dolomite core sample...
Suggesting a cost-effective and straightforward approach is indispensable for obtaining permeability...
A proper understanding of reservoir connectivity is essential to understanding the relationship betw...
Permeability governs the movement of fluids through pore networks of porous media. Applications incl...
Determining the effective permeability (keff) of geological formations has broad applications to sit...
With the application of modified equation a new permeability equation is developed from porosity and...
Knowledge of reservoir porosity, permeability, and capillary pressure is essential to exploration a...
Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff)...
Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff)...
In shales, a significant fraction of the pore sizes is within the 100-nm range and the transport pro...
Permeability is classified as one of the most critical properties of the porous medium. In general ...
The saturated hydraulic conductivity of soil, Ks, is a critical parameter in hydrological models tha...
Porosity and permeability are two important parameters for reservoir characterization, formation eva...
Paper description: Modeling of two or three-phase flow in porous media is of prime importance in es...
In this thesis a pore network modelling approach is used to investigate the correlation between diff...
A quantitative study of pore structure connection is presented based on the microscopic void volume ...
Suggesting a cost-effective and straightforward approach is indispensable for obtaining permeability...
A proper understanding of reservoir connectivity is essential to understanding the relationship betw...
Permeability governs the movement of fluids through pore networks of porous media. Applications incl...
Determining the effective permeability (keff) of geological formations has broad applications to sit...
With the application of modified equation a new permeability equation is developed from porosity and...
Knowledge of reservoir porosity, permeability, and capillary pressure is essential to exploration a...
Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff)...
Master of ScienceDepartment of GeologyBehzad GhanbarianDetermining the effective permeability (keff)...
In shales, a significant fraction of the pore sizes is within the 100-nm range and the transport pro...
Permeability is classified as one of the most critical properties of the porous medium. In general ...
The saturated hydraulic conductivity of soil, Ks, is a critical parameter in hydrological models tha...
Porosity and permeability are two important parameters for reservoir characterization, formation eva...
Paper description: Modeling of two or three-phase flow in porous media is of prime importance in es...
In this thesis a pore network modelling approach is used to investigate the correlation between diff...
A quantitative study of pore structure connection is presented based on the microscopic void volume ...
Suggesting a cost-effective and straightforward approach is indispensable for obtaining permeability...
A proper understanding of reservoir connectivity is essential to understanding the relationship betw...
Permeability governs the movement of fluids through pore networks of porous media. Applications incl...