Most metropolitan office buildings in Australia were built in 1980s and have out of date building services, consuming high level of energy and water as compared to new built green buildings. With a wide range of retrofit technologies/ options available in the market, building asset managers often find it difficult to develop a retrofit plan and select appropriate technologies. This paper categorized the retrofit technologies into three stages (passive control, active control and substitution control), and then proposed an innovative prioritization model using the concept of critical path method to design sequential implementation of sustainable retrofit technologies based on payback period. A few new concepts such as Add-on Effect and Drag-...
The construction industry is considered to play an essential role to economic growth. However, it co...
Energy-efficient retrofits embrace enhancement of the building envelope through climate control stra...
In the context of an increasing number of retrofitting projects and greater consideration for the cr...
This paper presents an energy conservation measures prioritization process of a residential Australi...
This paper identifies the dilemma faced by the stakeholders of existing buildings in regards to a de...
This paper presents an energy conservation measures prioritization process of a residential Australi...
Building retrofitting is an essential component of a plan to mitigate greenhouse gas (GHG) emissions...
Compelling reasons to undertake building retrofit are largely economic and environmental but also so...
Research was conducted regarding improving the primary method the Alabama Industrial Assessment Cent...
The building sector has high untapped energy saving potential. The main tool to exploit this potenti...
Purpose – Existing old building stock needs retrofit of structures and performance upgrading. Retrof...
Regenerative design and development within the built environment arises from the need totransition f...
Retrofitting of existing buildings offers significant opportunities to reduce global energy use and ...
Buildings play an essential role in energy use and climate change mitigation, consuming more than 40...
In the context of an increasing number of retrofitting projects and greater consideration for the cr...
The construction industry is considered to play an essential role to economic growth. However, it co...
Energy-efficient retrofits embrace enhancement of the building envelope through climate control stra...
In the context of an increasing number of retrofitting projects and greater consideration for the cr...
This paper presents an energy conservation measures prioritization process of a residential Australi...
This paper identifies the dilemma faced by the stakeholders of existing buildings in regards to a de...
This paper presents an energy conservation measures prioritization process of a residential Australi...
Building retrofitting is an essential component of a plan to mitigate greenhouse gas (GHG) emissions...
Compelling reasons to undertake building retrofit are largely economic and environmental but also so...
Research was conducted regarding improving the primary method the Alabama Industrial Assessment Cent...
The building sector has high untapped energy saving potential. The main tool to exploit this potenti...
Purpose – Existing old building stock needs retrofit of structures and performance upgrading. Retrof...
Regenerative design and development within the built environment arises from the need totransition f...
Retrofitting of existing buildings offers significant opportunities to reduce global energy use and ...
Buildings play an essential role in energy use and climate change mitigation, consuming more than 40...
In the context of an increasing number of retrofitting projects and greater consideration for the cr...
The construction industry is considered to play an essential role to economic growth. However, it co...
Energy-efficient retrofits embrace enhancement of the building envelope through climate control stra...
In the context of an increasing number of retrofitting projects and greater consideration for the cr...