This report contains the results of the seismic qualification tests performed on 250V DC, 100 KW for Mls KELTRON, Trivandrum. The seismic qualification tests, as approved by Nuclear Power Corporation (NPC), Mumbai were carried out in the Shake Table Facility at Structural Integrity Division (SID) of National Aerospace Laboratories13; (NAL), Bangalore. While tests were carried out by the staff of the Division, the representatives of MA KELTRON were involved in monitoring electrical performance, such as input and output voltage, and potential free contacts, of Standby Battery Charger during the test.13; These tests were witnessed by the representatives of MIs KELTRON and their user - NPC, Mumbai as well as QA office of NPC at Bangalore.13; Th...
A qualification test was performed according to the ENDESA regulation ETG 1.015 for 0.5g horizontal ...
After a brief introduction into the seismic requirements of ground-mounted electrical equipment of p...
A 3 pole circuit breaker was qualified on the vibration test facility MAVIS 1 for resistivity agains...
This report contains the results of the seismic qualification tests performed on 250V DC, 100 KW for...
This report contains the results of the seismic qualification tests performed on 250 AH and 750 AH H...
This report contains the results of the seismic qualification tests performed on13; 300 AH RPG/IMP L...
Earthquakes are one of the deadliest forces of nature that can shake structures to their limits. No ...
To demonstrate how high-level'' qualification test data can be used to estimate the ultimate seismic...
Earthquake damage to electrical systems degrades their performances and disrupts their normal functi...
Electrical equipment, particularly in critical facilities, should be subjected to seismic qualificat...
The electrical equipment especially in critical facilities needs a seismic qualification and so the ...
This work analyzes the seismic tests to valid technical starnards. Here is explained the term techni...
Seismic qualification tests on pneumatically operated directional valve were carried out in the shak...
The uninterruptible power supply system UNIBLOCK UB 330R 5/5 was qualified for seismic excitation in...
ABSTRACT: The importance of ensuring uninterrupted electric power supply was reaffirmed on the occas...
A qualification test was performed according to the ENDESA regulation ETG 1.015 for 0.5g horizontal ...
After a brief introduction into the seismic requirements of ground-mounted electrical equipment of p...
A 3 pole circuit breaker was qualified on the vibration test facility MAVIS 1 for resistivity agains...
This report contains the results of the seismic qualification tests performed on 250V DC, 100 KW for...
This report contains the results of the seismic qualification tests performed on 250 AH and 750 AH H...
This report contains the results of the seismic qualification tests performed on13; 300 AH RPG/IMP L...
Earthquakes are one of the deadliest forces of nature that can shake structures to their limits. No ...
To demonstrate how high-level'' qualification test data can be used to estimate the ultimate seismic...
Earthquake damage to electrical systems degrades their performances and disrupts their normal functi...
Electrical equipment, particularly in critical facilities, should be subjected to seismic qualificat...
The electrical equipment especially in critical facilities needs a seismic qualification and so the ...
This work analyzes the seismic tests to valid technical starnards. Here is explained the term techni...
Seismic qualification tests on pneumatically operated directional valve were carried out in the shak...
The uninterruptible power supply system UNIBLOCK UB 330R 5/5 was qualified for seismic excitation in...
ABSTRACT: The importance of ensuring uninterrupted electric power supply was reaffirmed on the occas...
A qualification test was performed according to the ENDESA regulation ETG 1.015 for 0.5g horizontal ...
After a brief introduction into the seismic requirements of ground-mounted electrical equipment of p...
A 3 pole circuit breaker was qualified on the vibration test facility MAVIS 1 for resistivity agains...