This paper describes the validation of a Remote Tower Control workplace. The study shows how Air Traffic Control Officers (ATCOs) observe traffic from a Tower Control Working Position at Airport Erfurt-Weimar (ERF) in comparison to a Remote Controller Working Position. The validation exercise targets low traffic density airports. Shadow-mode trials were used to cover perceptual, operational and human factors aspects of a Remote Tower System, including a live video panorama and a German Aerospace Center (DLR) research aircraft. The aircraft was used to fly different maneuvers within the aerodrome. These maneuvers allow insights on the detectability of an aircraft within different distances from the tower and the gathering of operation inform...
In the last couple of years, the interest in remote tower operation systems has increased, as a conc...
The aviation industry evolves all the time in every possible sphere with new the technology that is ...
What is the impact of shifting to remote tower operations on the Air Traffic Controller? In the join...
Abstract — This chapter describes the metrics for the validation of a Remote Tower Control workplace...
This paper describes a high-fidelity simulation study with twelve tower controllers within the conte...
In this chapter results from simulation studies are presented which were conducted to assess the ope...
In this chapter results from simulation studies are presented which were conducted to assess the ope...
Remote Tower Centers, where Air Traffic Services are provided independently of local airport control...
In the field of air transport operations, “Remote Tower” is a fast-growing concept offering more cos...
This study examines the impact of providing Air Traffic Control at a smaller aerodrome in a Remote T...
Owing to the different approaches for remote tower operation, a standardized set of indicators is ne...
Airport ground traffic control relies on visual surveillance by air traffic controllers from an elev...
The paper reports on an experimental work environment for simulating remote control of regional airp...
As part of the SESAR2020 PJ05 Remote Tower, new concepts are under test to facilitate safe, high-qua...
Research is described for realizing a Remote Airport Traffic Control Center (RAiCe) for remote surve...
In the last couple of years, the interest in remote tower operation systems has increased, as a conc...
The aviation industry evolves all the time in every possible sphere with new the technology that is ...
What is the impact of shifting to remote tower operations on the Air Traffic Controller? In the join...
Abstract — This chapter describes the metrics for the validation of a Remote Tower Control workplace...
This paper describes a high-fidelity simulation study with twelve tower controllers within the conte...
In this chapter results from simulation studies are presented which were conducted to assess the ope...
In this chapter results from simulation studies are presented which were conducted to assess the ope...
Remote Tower Centers, where Air Traffic Services are provided independently of local airport control...
In the field of air transport operations, “Remote Tower” is a fast-growing concept offering more cos...
This study examines the impact of providing Air Traffic Control at a smaller aerodrome in a Remote T...
Owing to the different approaches for remote tower operation, a standardized set of indicators is ne...
Airport ground traffic control relies on visual surveillance by air traffic controllers from an elev...
The paper reports on an experimental work environment for simulating remote control of regional airp...
As part of the SESAR2020 PJ05 Remote Tower, new concepts are under test to facilitate safe, high-qua...
Research is described for realizing a Remote Airport Traffic Control Center (RAiCe) for remote surve...
In the last couple of years, the interest in remote tower operation systems has increased, as a conc...
The aviation industry evolves all the time in every possible sphere with new the technology that is ...
What is the impact of shifting to remote tower operations on the Air Traffic Controller? In the join...