The purpose of this document is to provide a detailed description of the internal interfaces of the TerraSAR-X Instrument Operations and Calibration Segment (IOCS). The document lays down only the IOCS internal interfaces. The IOCS interfaces to external entities are described in the MOS-IOCS Interface Control Document [RD-02] and the PGS-IOCS Interface Control Document [RD-01]
This document describes the verification procedure of new IOCS Auxiliary Product versions which are ...
This Interface Control Document (ICD) defines the requirements for the interface between the Extra V...
This issue of the TerraSAR-X calibration design document identifies all procedures and algorithms ne...
This volume lays down the top level design of the Instrument Operations and Calibration Segment (IOC...
This document covers the interface between the Space Segment provided by EADS Astrium and the Instru...
This document describes the content and structure of the IOCS Auxiliary Product which consists of ...
This document expresses the answer to the TerraSAR-X Ground Segment Requirements Document [AD- 2]. A...
User Manual for the Data Take Verification Unit. This software is part of the TerraSAR-X Ground Segm...
The purpose of the following document is to provide a detailed description of the internal interface...
This Calibration/Verification Plan –Cal/Ver-Plan- sets the time schedule and is the master steering ...
This document is the plan for the integration, technical verification and validation of the TerraSAR...
The purpose of the following document is to provide a detailed description of the external interface...
the paper provides an overview of the System Engineering and Calibrations Segment (SEC) which is one...
This document is a reference to the generated command sets of all PN Gating Data Takes that are exec...
Abstract – The paper provides an overview about the System Engineering and Calibrations Segment (SEC...
This document describes the verification procedure of new IOCS Auxiliary Product versions which are ...
This Interface Control Document (ICD) defines the requirements for the interface between the Extra V...
This issue of the TerraSAR-X calibration design document identifies all procedures and algorithms ne...
This volume lays down the top level design of the Instrument Operations and Calibration Segment (IOC...
This document covers the interface between the Space Segment provided by EADS Astrium and the Instru...
This document describes the content and structure of the IOCS Auxiliary Product which consists of ...
This document expresses the answer to the TerraSAR-X Ground Segment Requirements Document [AD- 2]. A...
User Manual for the Data Take Verification Unit. This software is part of the TerraSAR-X Ground Segm...
The purpose of the following document is to provide a detailed description of the internal interface...
This Calibration/Verification Plan –Cal/Ver-Plan- sets the time schedule and is the master steering ...
This document is the plan for the integration, technical verification and validation of the TerraSAR...
The purpose of the following document is to provide a detailed description of the external interface...
the paper provides an overview of the System Engineering and Calibrations Segment (SEC) which is one...
This document is a reference to the generated command sets of all PN Gating Data Takes that are exec...
Abstract – The paper provides an overview about the System Engineering and Calibrations Segment (SEC...
This document describes the verification procedure of new IOCS Auxiliary Product versions which are ...
This Interface Control Document (ICD) defines the requirements for the interface between the Extra V...
This issue of the TerraSAR-X calibration design document identifies all procedures and algorithms ne...