This report presents a study of the structural analysis for removal operation of the Frigg TCP2 M32 Module with a new lifting arrangement situated at the top of the M32 Module. During the removal of the M32 from the Frigg TCP2 platform performed in 2005 a planned delay to the lifting operations was required, due to installation and welding of the M32 module lifting points at the bottom frame of the module. The intention of this study is to investigate if the interruption could have been avoided. This is done by performing structural analysis and verification of the M32 Module and the feasibility of installing padeyes at the top of the M32 Module. Global and local analysis covers the ultimate limit state and is carried out in accordance with...
Master's thesis in Offshore technologyA typical installation of a subsea structure with mono hull of...
A lifting hook is a device for grabbing and lifting loads by means of a device such as a hoist or a ...
The presented strength and fatigue calculations refer to an unsupported deck crane and its three dis...
Master's thesis in Structural engineeringThis report presents a study of the structural analysis for...
Master's thesis in Offshore structural engineeringDesign of offshore structures involves a variety o...
Master's thesis in Structural engineeringLarge competition in the offshore industry requires innovat...
motion analysis ABSTRACT: The installation phase for a topside module suggested can be divided into ...
This thesis aims to design the lifting lugs required for the lifting operations that are propaedeuti...
Industrialized and modular construction is a growing construction technique that can transfer a larg...
The structural analysis of topside module presents many technical challenges that have to be designe...
With the high demand of the consumption of oil and sub product of oil, the development of the exploi...
During cargo loading and unloading, the vessels' lifting gear, even if anchored or moored, is affect...
This thesis consists of two main objectives: Learning to use NORSOK-R002 and comparing it with Aker ...
With the conversion of a heavy transport vessel into a crane vessel, Boskalis aims to strengthen its...
A lifting fixture (drawing number 3823.113-MD-372382) that lifts large steel mandrels from one end t...
Master's thesis in Offshore technologyA typical installation of a subsea structure with mono hull of...
A lifting hook is a device for grabbing and lifting loads by means of a device such as a hoist or a ...
The presented strength and fatigue calculations refer to an unsupported deck crane and its three dis...
Master's thesis in Structural engineeringThis report presents a study of the structural analysis for...
Master's thesis in Offshore structural engineeringDesign of offshore structures involves a variety o...
Master's thesis in Structural engineeringLarge competition in the offshore industry requires innovat...
motion analysis ABSTRACT: The installation phase for a topside module suggested can be divided into ...
This thesis aims to design the lifting lugs required for the lifting operations that are propaedeuti...
Industrialized and modular construction is a growing construction technique that can transfer a larg...
The structural analysis of topside module presents many technical challenges that have to be designe...
With the high demand of the consumption of oil and sub product of oil, the development of the exploi...
During cargo loading and unloading, the vessels' lifting gear, even if anchored or moored, is affect...
This thesis consists of two main objectives: Learning to use NORSOK-R002 and comparing it with Aker ...
With the conversion of a heavy transport vessel into a crane vessel, Boskalis aims to strengthen its...
A lifting fixture (drawing number 3823.113-MD-372382) that lifts large steel mandrels from one end t...
Master's thesis in Offshore technologyA typical installation of a subsea structure with mono hull of...
A lifting hook is a device for grabbing and lifting loads by means of a device such as a hoist or a ...
The presented strength and fatigue calculations refer to an unsupported deck crane and its three dis...