Abstract: "This paper deals with the scheduling of multiproduct batch plants consisting of one unit per stage and involving the production of large number of batches of relatively few products (e. g. 10-50) with the Zero-Wait policy. An aggregation procedure based on a compact linear programming model is proposed for determining the minimum cycle time and the family of schedules with the optimum cycle time. It is shown that schedules can be easily derived from the LP solution using an aggregated graph representation. It is also shown that using this representation an approximate MILP model that yields very good near optimal solutions can be derived for the makespan minimization problem and for which very tight bounds can be established. The...
In this paper, we suggest optimal scheduling strategies for serial multiproduct batch processes to m...
During the last decade, the problem of production scheduling has been realized to be one of the most...
This paper presents a mixed integer linear programming formulation for the short-term scheduling of ...
Abstract: "Anticipating the impact of scheduling at the design stage can result in significant savin...
Abstract: "In this paper we propose a method for the integrated scheduling and design for a special ...
Production in a multipurpose batch chemical plant can be achieved in a series of campaigns, where ea...
Batch plants are the best option to manufacture relatively small quantities of speciality chemicals,...
The large number of studies addressing the scheduling problem in multiproduct batch plants with diff...
A wide variety of processing industries face the problem of determining the order in which different...
A novel list-based threshold-accepting (LBTA) algorithm is proposed for solving the zero-wait (ZW) s...
This paper presents a continuous-time mixed-integer linear programming (MILP) model for short-term s...
This study presents a continuous-time mixed-integer linear programming model for short-term scheduli...
Abstract: "Execution of tasks in dynamic batch units provides additional operating freedom via trans...
Abstract: "Production planning and scheduling are intimately linked activities. Since the production...
Scheduling problems in multipurpose batch process industries are very hard to solve because of the j...
In this paper, we suggest optimal scheduling strategies for serial multiproduct batch processes to m...
During the last decade, the problem of production scheduling has been realized to be one of the most...
This paper presents a mixed integer linear programming formulation for the short-term scheduling of ...
Abstract: "Anticipating the impact of scheduling at the design stage can result in significant savin...
Abstract: "In this paper we propose a method for the integrated scheduling and design for a special ...
Production in a multipurpose batch chemical plant can be achieved in a series of campaigns, where ea...
Batch plants are the best option to manufacture relatively small quantities of speciality chemicals,...
The large number of studies addressing the scheduling problem in multiproduct batch plants with diff...
A wide variety of processing industries face the problem of determining the order in which different...
A novel list-based threshold-accepting (LBTA) algorithm is proposed for solving the zero-wait (ZW) s...
This paper presents a continuous-time mixed-integer linear programming (MILP) model for short-term s...
This study presents a continuous-time mixed-integer linear programming model for short-term scheduli...
Abstract: "Execution of tasks in dynamic batch units provides additional operating freedom via trans...
Abstract: "Production planning and scheduling are intimately linked activities. Since the production...
Scheduling problems in multipurpose batch process industries are very hard to solve because of the j...
In this paper, we suggest optimal scheduling strategies for serial multiproduct batch processes to m...
During the last decade, the problem of production scheduling has been realized to be one of the most...
This paper presents a mixed integer linear programming formulation for the short-term scheduling of ...