This paper presents an integrated system in which a computer-based decision support system (DSS) for construction project risks assessment at stage of contracting and construction. The Analytic Hierarchy Process (AHP) method is used to determine the weightings of risk factors from subjective judgment of experts and practitioners, and Fuzzy Multiple Criteria Decision Making (FMCDM) is used to assess the synthetic judgment of risk degree for the main activities of a construction project in different phase. A simple case study illustrates the effectiveness of the proposed approach and developed system
Risk is involved in every business, and the construction industry is no exception. Most of the proje...
AbstractRisk management is critical for success in project-based industries, especially in the const...
Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic b...
This paper presents an integrated system in which a computer-based decision support system (DSS) for...
The paper develops an innovative risk evaluation methodology to address the challenges of multicrite...
The increasing complexity and dynamism of construction projects have imposed substantial uncertainti...
The signification risks associated with construction projects need special attention from contractor...
The increasing complexity and dynamism of construction projects have imposed substantial uncertainti...
Risk factor selection is an important step in a successful risk management plan. There are many risk...
Construction projects are affected by a variety of risk factors, and they often fail to achievetheir...
AbstractThe paper presents risk assessment of construction objects for the project of commercial cen...
Risk factor selection is an important step in a successful risk management plan. There are many risk...
Planning and managing the risks is the first step that should be performed at the start of projects ...
Risk management is an approach of recognizing, classifying, analyzing and assessing of all risks in ...
Construction industry involves complex and challenging process associated with the risk of injury, d...
Risk is involved in every business, and the construction industry is no exception. Most of the proje...
AbstractRisk management is critical for success in project-based industries, especially in the const...
Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic b...
This paper presents an integrated system in which a computer-based decision support system (DSS) for...
The paper develops an innovative risk evaluation methodology to address the challenges of multicrite...
The increasing complexity and dynamism of construction projects have imposed substantial uncertainti...
The signification risks associated with construction projects need special attention from contractor...
The increasing complexity and dynamism of construction projects have imposed substantial uncertainti...
Risk factor selection is an important step in a successful risk management plan. There are many risk...
Construction projects are affected by a variety of risk factors, and they often fail to achievetheir...
AbstractThe paper presents risk assessment of construction objects for the project of commercial cen...
Risk factor selection is an important step in a successful risk management plan. There are many risk...
Planning and managing the risks is the first step that should be performed at the start of projects ...
Risk management is an approach of recognizing, classifying, analyzing and assessing of all risks in ...
Construction industry involves complex and challenging process associated with the risk of injury, d...
Risk is involved in every business, and the construction industry is no exception. Most of the proje...
AbstractRisk management is critical for success in project-based industries, especially in the const...
Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic b...