The probabilistic models to assess seismic hazard and seismic risk incorporated into the codes CRISIS2015 & USERISK2015, respectively, are applied to compute the seismic risk of buildings of Barcelona. The main procedures required to assess the seismic risk using these codes are briefly described in the present document. A new version of USERISK, which is being developed in the Barcelona Supercomputing Center was used in the present work. According to the results, the levels of seismic risk of the Eixample District of Barcelona are important due mainly to the high levels of seismic vulnerability of its buildings
The Vulnerability Index Method, in its version developed in the framework of the European project Ri...
The development of the district of the Eixample started in 1860. During 90 years of construction, th...
A comprehensive and probabilistic seismic risk assessment has been performed for the buildings of Lo...
The probabilistic models to assess seismic hazard and seismic risk incorporated into the codes CRISI...
A probabilistic methodology (LM1_P) based on the LM1 method of the Risk-UE project, is applied to es...
A probabilistic method called LM1_P, which is based on the LM1 method of the RISK-UE project is used...
In the present work, the main steps used in the probabilistic estimation of the seismic hazard of th...
A probabilistic model to estimate seismic risk is presented. The main elements of this model are the...
The final publication is available at Springer via http://dx.doi.org/10.1007/s10518-018-0516-4Risk a...
A probabilistic model to estimate the seismic risk of buildings is evaluated. For this purpose a spe...
In the present work a probabilistic methodology to estimate the seismic risk of buildings in urban a...
One of the main objectives of the seismic risk management is the creation of methodologies to take d...
A methodology to evaluate the vulnerability and seismic risk of existing building structures in an u...
The basic input when seismic risk is estimated in urban environments is the expected physical damage...
The original publication is available at http://www.springerlink.comThe Vulnerability Index Method, ...
The Vulnerability Index Method, in its version developed in the framework of the European project Ri...
The development of the district of the Eixample started in 1860. During 90 years of construction, th...
A comprehensive and probabilistic seismic risk assessment has been performed for the buildings of Lo...
The probabilistic models to assess seismic hazard and seismic risk incorporated into the codes CRISI...
A probabilistic methodology (LM1_P) based on the LM1 method of the Risk-UE project, is applied to es...
A probabilistic method called LM1_P, which is based on the LM1 method of the RISK-UE project is used...
In the present work, the main steps used in the probabilistic estimation of the seismic hazard of th...
A probabilistic model to estimate seismic risk is presented. The main elements of this model are the...
The final publication is available at Springer via http://dx.doi.org/10.1007/s10518-018-0516-4Risk a...
A probabilistic model to estimate the seismic risk of buildings is evaluated. For this purpose a spe...
In the present work a probabilistic methodology to estimate the seismic risk of buildings in urban a...
One of the main objectives of the seismic risk management is the creation of methodologies to take d...
A methodology to evaluate the vulnerability and seismic risk of existing building structures in an u...
The basic input when seismic risk is estimated in urban environments is the expected physical damage...
The original publication is available at http://www.springerlink.comThe Vulnerability Index Method, ...
The Vulnerability Index Method, in its version developed in the framework of the European project Ri...
The development of the district of the Eixample started in 1860. During 90 years of construction, th...
A comprehensive and probabilistic seismic risk assessment has been performed for the buildings of Lo...